Page 1
PARTS LIST Spare Spare Name Part Name Part Qty. Qty. Sterling Series Sterling Series Storage Cabinet Case REALS004 REALS025 Wood Dowel Door Stop Model No. STESCC REALS001 REALS017 Ø3.5 x 16mm 20 1 REALS002 REALS146 Cam Post Ø3x19mm REALS617** REALS609...
Page 2
Review ALL instructions before beginning assembly. These instructions are provided to avoid problems that may occur from improper assembly or installation. Mayline and/or its distributor are not responsible for failure resulting from improper assembly or installation of this product. Moreover, all warranties are void Bottom Panel for failure to follow these assembly instructions.
Page 3
Insert Shelf Supports (E) into the Side Panels M & N at the desired Insert Wood Dowels (A) into TOP (K). Insert Cam (B) into TOP (K). Install Cam Posts (C) Side Panel (L & M). Attach Top (K) to assembled cabinet height.
Need help?
Do you have a question about the Sterling Series and is the answer not in the manual?
Questions and answers