7-6 Test mode operation
7-6-1. Entrance for the test mode operation
The
test
mode
adjustment of mechanical position (height or
stroke)
for
equipment and also for check the position of
the sensors of the cylinders. For entrance this
mode,
(1) Turn the power switch ON.
Set the changeover switch (
(2)
Manual (test mode).
The operation panel screen will
(3)
change to the Manual (test mode)
screen.
Even when the changeover switch (
when the power switch is turned ON, the Manual (test mode) screen will open.
Out / In signal can be checked by
NOTE
checking mode in the operation
panel. Please refer to IN/OUT Setting
Mode in the technical manual
[OPERATION PANEL]
operation
is
the
thermal
thread
NO.
used
for
trimmer
) to
) is already set to Manual (test mode)
NO.
26