2VV STANDESSE XP VCST5D150-V3 Series Installation Manual

2VV STANDESSE XP VCST5D150-V3 Series Installation Manual

Advertisement

EN
STANDESSE XP
INSTALLATION

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the STANDESSE XP VCST5D150-V3 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for 2VV STANDESSE XP VCST5D150-V3 Series

  • Page 1 STANDESSE XP INSTALLATION...
  • Page 2: Before You Begin

    Save this user manual for further use. The instructions in this manual are a part of the product. Statement of compliance Please find details on the website www. vv.cz 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 3 All used packaging materials are environmentally friendly and may be reused or recycled. Take an active part in environmental protection and see that packaging materials are correctly disposed of or repurposed. 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 4 3. MAIN PARTS 3. CONTENTS VCST5D-xxx-xx-EC-S1 Master KAB-10-PROP-UTP VCST5D-xxx-xx-EC-S2 KAB-10-PROP-UTP Slave VCST5D-300-xx-EC-S1 KAB-10-PROP-UTP Coupling bracket VCST5-KOT-SPOJ-CLON including screws 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 5: Main Parts

    If the unit was transported in temperatures lower than 0°C, after unpacking, leave it for at least two • hours without activating in order to allow unit to climatize to room temperature. 1. Suspension connection points 2. Water coil connection 3. Inlet face nozzle 4. Outlet grid 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 6 2565 mm 2525 mm VCST5D300 3182 mm 1545 + 1545 mm 1505 + 1505 mm VCST5D150 1637mm 1545mm 1505mm VCST5D200 2147mm 2055mm 2015mm VCST5D250 2657mm 2565mm 2525mm VCST5D300 3182mm 1545+1545mm 1505+1505mm 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 7: Technical Parameters

    [kW] [m3/h] [°C] [°C] [°C] [°C] [kPa] VCST5D150-V5... 6000 47,8 41,4 2,09 VCST5D200-V5... 8000 65,5 42,1 2,84 VCST5D250-V5... 10000 84,7 42,9 11,7 3,71 VCST5D300-V5... 12000 95,5 41,4 4,18 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 8 [kW] [m3/h] [°C] [°C] [°C] [°C] [kPa] VCST5D150-V5... 6000 14,8 25,3 1,30 VCST5D200-V5... 8000 21,2 25,8 1,84 VCST5D250-V5... 10000 28,8 26,5 2,48 VCST5D300-V5... 12000 29,6 25,3 2,59 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 9: Installation

    CHOOSE THE INSTALLATION SITE AND INSTALL THE AIR CURTAIN Maximum recommended installation tolerances min. 200 mm min. 300 mm 995 mm INSTALLATION DIMENSIONS - HORIZONTAL INSTALLATION 1004 1004 1004 1004 1004 1004 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 10 Used material: Used material: Wall anchor Wall anchor wall bracket Ceiling bracket (part of the set: VCST5-KOT-H-STROP ) (part of the set: VCST5-KOT-H-STENA ) Screw Screw ŘEZ A-A 804,7 804,7 804,7 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 11 U stropní instalace použijte "SADU stropních konzol": VCS4-KONZ-STR. "SADA stropních konzol" musí být objednána zvlášť, jako volitelné příslušenství. 6.1.-2 Clearance distance 15,5 15,5 95,5 175,5 255,5 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 12 Install the air curtain using fork lift platform TIP: If the air curtain is packed horizontally, you can leave it in the crate and lift the entire assembly up. 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 13 6. INSTALLATION Fasten to prepared threaded rods Installation dimensions - adjustable outlet grille 20° 5° 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 14 6. INSTALLATION The air curtain type VCST5D300 is made of two modules that must be connected. Master Slave Master Slave Connecting plate and screws are included 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 15 6. INSTALLATION installation of 3m air curtain Connect air curtain on the ground Connect air curtain to wall/ceiling bracket 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 16 To avoid switching off the RCD (residual current device), it is recommended to connect an additional earth wire (CY 4). L1 L2 L3 N Pe Power supply 230V KAB-10-PROP-UTP cable UTP is included Master Slave Room REF. Outside AIR 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 17 6. INSTALLATION Opening the air curtain for service and controls access 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 18 (T20) pull down the control board unscrew the locking screws (T20) remove the control cover in direction of arrow 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 19 6. INSTALLATION Opening the air curtain for filter replacement Filter 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 20 Zone valve ZV3 or ZV2 is a required accessory for control module Detailed description of water coil regulation by zone valve (ZV3/ ZV2), including it´s connection, • please refer to the instruction manual for zone valve ZV 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 21 The electrical enclosure of the air curtain is IP 20. • The electrical parameters are shown on the manufacturer‘s label, which is located under the air • curtain‘s service cover. 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 22 6. INSTALLATION CONNECTING THE CONTROL DISPLAY PANEL 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 23 0,4 A max. 0,4 A max. 0,4 A max. 2 A 230V 230V NTC 10K max. 2 A max. 2 A max. 0,4 A max. 0,4 A NTC 10K 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 24 / RH/VOC CAPTEUR 0-10V SENSOR EXTERNAL EXTERNAL EXTERNAL defrost defrost defrost 2VV.Creating innovative solutions for you and your business since 1995. DX GENERAL ERROR DX DEFROST DX GENERAL ERROR DX DEFROST DX GENERAL ERROR DX DEFROST 51 52 51 52...
  • Page 25 The total bus length of all chained curtains must not exceed 150m!!! SLAVE SLAVE SLAVE no.1 no. 6 no.2 no. 7 no. 3 no. 8 no. 4 no. 9 no. 5 no. 10 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 26: Initial Start-Up

    The control panel is properly connected • During the commissioning, check the proper function of the unit (fans, heating). Check the other possible settings and functions according to the user manual 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 27 STANDESSE XP AirGENIO superior control...
  • Page 28: Description Of Main Screen

    Shows current temperature, air flow, hea- ting level, time and control mode. Information icon The menus are described below page 13 page 14 Device cooling Night reduction page 17 Time mode DOOR mode 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 29: Current Status

    Current date and time Display the current air flow status Reduce or increase Back to main screen opening’s air flow Confirm (with closed doors) + return Confirm + return 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 30 Copy + return Annual mode START / STOP interval Tap to add a new time mode CANCEL Only MANUAL Required ventilation rate in manual mode Required heating rate in manual mode 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 31 The IP address and pin code of the device can be manually be entered or use a QR code for pairing the unit. 1. Pairing using a QR code: DAPHNE Setting the date and time 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 32: Service Menu

    Outlet – Temperature sensor at the outlet (behind the exchanger) Inlet – Temperature sensor at the inlet (before the exchanger) Room – Room temperature sensor Thermostat – Room thermostat (ON/OFF) Room BMS – Room temperature sensor from master system 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 33 An incorrect setting may prevent communication with the regulator In this menu, the reduction of temperature may be set only by five degrees at the set time compared to the set (required) temperature. 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 34 In this menu it is possible to specify which sensor will be active and the temperature the shutter will attempt to reach after closing doors so as to balance temperature loss. After reaching the set temperature, the shutter transitions into the selected automatic/manual mode. 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 35 Min - Max Allowed = The SLAVE unit can be turned on/off individually form the main screen Setting fans power limits limits for losed doors. Min - Max 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 36 Example of controller connection – Option 1: Press “FACTORY RESET” to reset the default values of MENU 1616 Electric connection – Option 1: Once completed, we recommend to turn the main supply off and on. 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 37 The heater overheats due to insufficient air flow. Check off automatically operational that the ventilators are in good order and that the air but not supply is not disrupted. heating 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 38: Wiring Diagram

    8. WIRING DIAGRAM VCST5D250-V*-S1-*** VCST5D250-V*-S2-*** 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 39 8. WIRING DIAGRAM VCST5D250-S*-S1-*** VCST5D250-S*-S2-*** 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 40 8. WIRING DIAGRAM VCST5D200-V*-S1-*** VCST5D200-V*-S2-*** 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 41 8. WIRING DIAGRAM VCST5D200-S*-S1-*** VCST5D200-S*-S2-*** 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 42 8. WIRING DIAGRAM VCST5D150-V*-S1-*** VCST5D150-V*-S2-*** 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 43 8. WIRING DIAGRAM VCST5D150-S*-S1-*** VCST5D150-S*-S2-*** 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 44: Cleaning And Maintenance

    The product is good to dispose at the place, which is specialized for it, and thus it will be possible to recycle materials. Store unusable parts of the product at a controlled dump. When disposing of materials, it is necessary to observe the relevant national regulations on waste disposal. 2VV.Creating innovative solutions for you and your business since 1995.
  • Page 45 CONTACT Adresa Address: Fáblovka 568 2VV, s.r.o., Poděbradská 289, Pardubice-Staré Hradiště 533 52 530 09 Pardubice, Česká republika Česká republika Internet: http://www.2vv.cz/ 2VV.Creating innovative solutions for you and your business since 1995.

Table of Contents