Installation - Beko DRYPOINT AC Series Installation And Operating Manual

Cold-regenerated adsorption dryer with dew point control
Table of Contents

Advertisement

EN
DRYPOINT
AC
®
Size
410
415
418
423
430
438
455
465
485
495

3. Installation

DANGER
External forces and torques
The plant must be protected against external forces and torques, as these could cause
damage, leading to leakage or even malfunction of the plant.
NOTE
Responsibility for proper installation
NOTE
Integration into existing piping
If the plant is to be installed into an existing pipeline, the operator must take into account that
the pipes downstream of the place of installation of the dryer might be contaminated. It might
therefore be necessary to clean or replace this piping sections and the components.
DRYPOINT
AC 410 – 495 | DRYPOINT
®
Regeneration air flow rate (m³/h)
at 1 bar, 20 °C
Standard
15.0
23.0
26.3
34.0
45.0
56.0
83.0
98.0
128.0
150.0
Ensure that no external forces and torques are transferred to the plant through the on-
site piping system. Otherwise, the permissible load on the system might be exceeded.
If necessary, the plant operator must carry out tests or make modifications to the on-site 
installations.
The adsorption dryer must be protected against vibration caused by other units. If
necessary, the operator must take suitable measures to prevent the propagation of
vibration.
The operator is responsible for the proper installation of the adsorption dryer, and of the
piping to and from the plant.
The manufacturer is not responsible for the planning or installation of safety devices that
prevent overvoltage, short circuits or overloads.
AC 410 – 495 MS
®
MS
Standard
20
81.6
30
121.7
35
142.7
45
183.2
60
244.7
75
306.1
220
447.9
130
529.5
170
692.6
200
815.5
Installation and operating manual
Air exit flow rate (m³/h)
at 1 bar, 20 °C
MS
75.4
113.1
132.0
170.0
226.2
282.8
414.7
490.1
640.9
754.0
27