Ground Control Station; Ground Control Station; See "Ground Control Station - JLG X500AJ Operation And Safety Manual

Table of Contents

Advertisement

3.1

GROUND CONTROL STATION

Before operating the Ground Control Station, determine which control valve is installed on your machine.
If your ground control station looks like this with the (RED)
Function Enable Lever on the left side of the valve set, See
"Ground Control Station - With Enable Lever" on page 4.
Figure 3-2. See "Ground Control Station - With Enable
Lever" on page 4.
3121636
SECTION 3 - MACHINE CONTROLS, INDICATORS AND OPERATION
If your ground control station looks like this with the
(BLACK) Function Enable Knob on the right side of the valve
set, See "Ground Control Station - With Enable Knob" on
page 7.
Figure 3-3. See "Ground Control Station - With Enable
– JLG Lift –
Knob" on page 7.
3-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents