No. of children: up to 10, min. use zone: 16’-1” x 23’-6”, set dim. 4’-1”w x 11’-6”l x 9’-10”h, est. building time: 2-4 hr. (89 pages)
Summary of Contents for Swing-N-Slide JAMBOREE
Page 1
PB 8328 WS 8328 JAMBOREE IMPORTANT!! PLEASE READ BEFORE BEGINNING ASSEMBLY!! Please make sure all lumber, hardware and accessory parts are accounted for. If you are missing anything, please DO NOT RETURN to the store where purchased. Please call our Customer Service Department at the number below.
Page 12
STEP 1 Check to make sure Flush structure is square Per Board NOTE HOLES PANEL A Install 30mm Screws With Heads Flushed To Board To Avoid Protrusions. Per Board PANEL B Per Board Flush PANEL C Per Board...
Page 13
STEP 2 Per Board Check to make sure structure is square Per Board FLUSH PANEL D Per Board Per Board FLUSH Install 30mm Screws With Heads Flushed To Per Board Board To Avoid FLUSH Protrusions. PANEL E...
Page 14
STEP 3 Check to make sure structure is square PANEL C Flush T-Nut Small Flush NOTE HOLES Flush to the bottom NOTE: HOLE ORIENTATION T-Nut Small Flush FRAME A Flush Note: Tap each T-Nut into its pre-drilled hole until the metal tangs sink fully into the wood.
Page 16
STEP 5 T-Nut Small per Board This Side NOTE HOLE Flush per Board NOTE: This Side HOLE ORIENTATION T-Nut Small FRAME B Flush Check to make sure structure is square WINDOW PANE INSTALL Note: Tap each T-Nut into its pre-drilled hole until the metal tangs sink fully into the wood.
Page 18
STEP 7 Flush 3’’ From Outside of Post PANEL A Flush Check to make sure structure is square 3’’ From outside of post To end of horizontal PANEL A support. Flush to Flush outside edge of 3”x 3” PF 6338 Flush to 94-1/4’’...
Page 19
STEP 8 FRAME A Flush Flush 3’’ From Outside of Post to End of Horizontal Support. Side View of Tower FRAME B 19-1/2’’...
Page 20
STEP 9 Flush per side Back of Tower Flush NOTE: PRE-DRILL HOLES GOING INTO DECK SUPPORTS per side 55-1/4’’ 11’’ 11’’ Top View of Tower...
Page 21
STEP 10 per board Flush Flush per joint Flush PANEL B PANEL B INSTALL...
Page 44
STEP 33 NOTE HOLES NOTE HOLES TABLE SUPPORT Top View of Table Inside View of Table...
Page 45
STEP 34 Flush Flush Check to make sure structure is square BOTH TABLE SIDES PRE-DRILL BOARDS WITH 1/8’’ DRILL BIT TO MINIMIZE SPLITTING BOTH SIDES Note: Pre-Drill boards with 1/8’’ drill bit as shown to prevent splitting.
Page 46
STEP 35 Flush Make Certain This Side Has Holes Closest To The Edge. Flush per side TO BOTTOM OF SUPPORT SUPPORT TO BOTTOM OF SUPPORT...
Page 53
STEP 42 Carriage Bolt Spacer Loc Nut Steering Wheel Assembly 1. Choose a desired location for the Steering Wheel and drill a 5/16” diameter hole through the lumber. NOTE: If lumber is greater than 2” in depth, you will need to counterbore the hole appropriately. 2.
Page 54
STEP 43 Telscope Assembly Mounting Screw Mounting Bracket Telescope Assembly STEP 44 Per Flag Flag Assembly...
Page 55
STEP 45 Fold up Anchor-It Strap Screw Anchor-It Note: Keep as little play as possible using any of the holes in the strap that work best. TIP: Drill Bit, or a long screw driver then insert and install the Anchor-Its as shown. This will allow you to get traction with the Anchor-It faster and allow the device to seat more securely.
Page 56
Components, Chains, Hardware and Fasteners – 5 years. These items to be free from defects in workmanship and materials, under normal use Swing-N-Slide® will repair, or at its discretion, replace any part within the stated warranty period which is defective in workmanship or materials.
Page 57
PRODUCT WARRANTY & REGISTRATION Please register online to properly initiate your product warranty & registration Quick & simple from home or mobile Record your purchase in our system Initiate product warranty Improved customer support Register your product online at www.OnlineWarranty.net...
Page 58
Call our Customer Support Representatives Printed in USA...
Need help?
Do you have a question about the JAMBOREE and is the answer not in the manual?
Questions and answers