Pilot Air PAC Series Users Maintenance And Spare Parts Manual page 12

Table of Contents

Advertisement

DESCRIPTION OF THE COMPRESSOR
1)
Electrical equipment
2)
Front panel / Oil Indicator Level
3)
Lid
4)
Electric fan
5)
Oil filter
6)
Oil separator filter
7)
Minimum pressure valve
8)
Oil separator tank
UNPACKING AND HANDLING THE MACHINE
When delivered, compressor top is protected by cardboard packing.
Wear suitable protective gloves and then cut outer straps and then remove cardboard from the top.
Check the (outer) good condition of the machine before moving the compressor. Visually check that no
parts are damaged. Also, ensure that all accessories are available.
Lift the machine using a fork lift truck. Move the machine to the room chosen for its location with
maximum care.
Keep all packing materials at least for the warranty period for possible moving. In case of need, it will
be safer for delivery to the technical assistance dept.
Then, dispose of packing materials in compliance with current laws.
LOCATION (fig. 2)
The room chosen for the installation of the
compressor should meet the following requirements
and comply with what is specified in the current safety
and accident prevention regulations:
o low percentage of fine dust,
o proper room ventilation and size that allow
room temperature under 45° C. In the event of
inadequate hot air discharge, fit the exhaust
fans as high as possible.
Condensate should be collected either into a
container or a tank, or a water/oil separator should be
fitted.
CONDENSATE IS A POLLUTING MIXTURE! It must
not be let into the sewage.
The dimensions of the spaces are indicative only but
it is advisable to follow them as closely as possible.
12 |
P a g e
Installation
9)
Air Filter
10)
Air/Oil Radiator
11)
Electric Motor
12)
Control Panel
13)
Air Intake Outlet
14)
Suction Regulator
15)
Screw Compressor
PLUS 56-75-Cod.197DD8805

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pac5.5

Table of Contents