Download Print this page

WE-EF FLB141 4 LED Installation And Maintenance Instruction page 6

Bracket mounted floodlight

Advertisement

5) Feed mains supply cable G (and second cable
H for through wiring, if required) through mem-
brane spout(s) I
A in position.
7) Connect mains supply cable G leads to
respective terminals of socket K:
a) ON/OFF (L = Phase, N = Neutral,
= Earthing)
b) 1-10 V/DALI (L = Phase, N = Neutral,
= Earthing, DA/DA = DALI control line,
D–/D+ = 1-10 V control line).
screws D.
Attention: Nylon washers J must remain in
position to provide sealing.
8) Ensure that all surfaces are clean and dry.
and attach terminal connector C. Tighten
screws B.
5
A, insert and tighten
A

Advertisement

loading