Summary of Contents for WE-EF FLC200-CC LED Series
Page 1
WE-EF LIGHTING Installation and Maintenance Instructions for Projectors FLC200 LED Series FLC200-CC LED Series INSTALLER HOTLINE +61 458 933 399 7am – 7pm AEST...
5) Feed mains supply cable D through cable gland E. An Installation additional M20 gland is supplied to allow loop The product must be installed and maintained by a suitably through of supply cabling or alternative DMX cabling qualified professional in compliance with latest building/ arrangements.
Page 5
Neutral to N and Earthing to Class II Phase to L1, Control Phase to L2, Neutral to N 1-10V / DALI / WE-EF Eco Step Dim® Dynamic / CC Class I Phase to L1, Neutral to N and Earthing to –...
Page 6
Notice: In case the luminaire is equipped with an optional available surge protector, the function can get tested if the signal LED is lit green when the supply voltage is turned on. In case the surge protector is defective, the LED device gets automatically disconnected from the mains supply.
Need help?
Do you have a question about the FLC200-CC LED Series and is the answer not in the manual?
Questions and answers