Download Print this page

WE-EF FLB141 #2 Installation And Maintenance Instructions Manual

Advertisement

Quick Links

Do not open during installation
This product is factory-sealed.
Refer to the instructions contained in this
document for details.
Surge Protection
This product features built-in surge protection circuitry in compliance with
applicable standards.
For comprehensive protection of a luminaire installation against lightning and
electrical surges, it is essential to cover mains supply and data input lines at
the distribution board level, by using respective primary (Type 1) and secondary
(Type 2) surge arrestors in compliance with EN61643-11/IEC61643-1.
Warning
Ensure that all required surge protection measures are in place and activated
prior to luminaire installation. Also, disconnect luminaires before operating
high-power devices such as, for example, electrical arc welders.
WE-EF LEUCHTEN
Installation and Maintenance
Instructions
Floodlight
FLB141 #2 LED

Advertisement

loading
Need help?

Need help?

Do you have a question about the FLB141 #2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for WE-EF FLB141 #2

  • Page 1 WE-EF LEUCHTEN Installation and Maintenance Instructions Floodlight FLB141 #2 LED Do not open during installation Surge Protection This product is factory-sealed. This product features built-in surge protection circuitry in compliance with Refer to the instructions contained in this applicable standards.
  • Page 2 Floodlight FLB141 #2 IP66, IK08. Class I. ta = 40°C Weight for FLB141 #2 LED Windage area m² for FLB141 #2 LED 0.0506 Orientation: all directions...
  • Page 3: Maintenance

    Light Source Maintenance Apart from cleaning the product’s exterior surfaces, no special maintenance work is required. Do not use high-pressure cleaners. In case of component failure due to abnormal circumstances or at end of life, replacement must be carried out Warning: Do not open luminaire while mains supply is switched on.
  • Page 4: Installation

    – DO NOT INSTALL ON WET CONCRETE! Handling: handled with care, scratches and damage to the coated surface can result in galvanic corrosion. A WE-EF warranty does not cover any adverse reaction or damage, due to improper installation and requests that our recommendations are followed.
  • Page 5: Installation Procedure

    Installation Procedure 1) Switch off mains electrical supply. 2) Check that rating shown on luminaire label conforms with mains electrical supply. 07/18 IP66 FLB141-LED 220-240V50-60/Hz 161-XXXX SOE XXXXXXX LED 3000K 18W item no. XXX (example) A by loosening screws B. Disconnect terminal connector C. Drill relevant holes E and insert wall plug F.
  • Page 6 5) Feed mains supply cable G through the pres- 6) Connect mains supply cable G leads to sure screw I respective terminals in terminal connector C: A, insert and a) ON/OFF (L = Phase, N = Neutral, tighten screws D. Ensure nylon washers stay = Earthing) in position.
  • Page 7 Tel +1 724 742 0030 Fax +41 22 752 49 74 Fax +1 724 742 0035 info.switzerland@we-ef.com info.usa@we-ef.com WE-EF LIGHTING United Kingdom Tel +44 844 880 5346 Fax +44 844 880 5347 info.uk@we-ef.com TO9249W0121 © WE-EF 2019 subject to change.