Installation Instructions
INSTALLING THE REFRIGERATOR (Cont.)
TURN ON THE WATER SUPPLY
14
Turn the water on at the shutoff valve (house
PLUG IN THE REFRIGERATOR
15
See the grounding information attached to the
power cord.
Once the unit is on, press the dispenser paddle
and dispense water for at least 5 minutes to
remove air from the water line, and flush the
filter. The first few batches of ice should also
away the first bin of ice production.
38
LEVEL THE REFRIGERATOR
16
The leveling legs have 2 purposes:
1. Leveling legs adjust so the refrigerator is
firmly positioned on the floor and does not
wobble.
to hold the refrigerator securely in position
during operation and cleaning. The leveling
legs also prevent the refrigerator from tipping.
Turn the leveling legs clockwise to raise the
A
refrigerator, counterclockwise to lower it.
NOTICE: To avoid possible property damage,
the leveling legs must be firmly touching the
floor.
Raise
49-60792 Rev. 4
Need help?
Do you have a question about the Profile DFE Series and is the answer not in the manual?
Questions and answers