NTP- A9 Install the Electrical Card Cables on the Backplane
NTP-A9 Install the Electrical Card Cables on the Backplane
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Always use the supplied ESD wristband when working with a powered ONS 15454. Plug the wristband
Caution
cable into the ESD jack located on the lower-right outside edge of the shelf assembly.
Refer to the Cisco ONS 15454 Reference Manual for more information about EIAs.
Note
Complete the
Step 1
electrical cables you will install.
Complete the
Step 2
page 17-30
To install DS-1 cables using AMP Champ cables, complete the
Step 3
Cables on the AMP Champ EIA" task on page
Complete the
Step 4
Complete the
Step 5
as needed.
Complete the
Step 6
Complete the
Step 7
Complete the
Step 8
Continue with the
Step 9
Stop. You have completed this procedure.
Cisco ONS 15454 Procedure Guide, Release 8.5.1
1-22
Optional EIA backplane covers are typically preinstalled when ordered
with the ONS 15454. The following procedure describes how to install the
electrical card cables to the backplane. If the shelf was not shipped with the
correct EIA interface, you must order and install the correct EIA.
Wire wrapper
Twisted-pair cables
BNC insertion tool
SMB cable connector
#2 Phillips screwdriver
Medium slot-head screwdriver
DS-1 and DS-3 cables, as needed
Tie-down bar, as needed
NTP-A5 Install the EIAs, page 1-8
As needed
Onsite
None
"DLP-A530 Install the Tie-Down Bar" task on page 22-30
"DLP-A23 Install DS-1 Cables Using Electrical Interface Adapters (Balun)" task on
as needed. Baluns are used on SMB EIAs to properly terminate DS-1 signals.
"DLP-A25 Install Coaxial Cable With BNC Connectors" task on page 17-34
"DLP-A26 Install Coaxial Cable With High-Density BNC Connectors" task on page 17-35
"DLP-A27 Install Coaxial Cable with SMB Connectors" task on page 17-35
"DLP-A386 Install Electrical Cables on the UBIC-V EIAs" task on page 20-84
"DLP-A441 Install Electrical Cables on the UBIC-H EIAs" task on page 21-22
"NTP-A10 Route Electrical Cables" procedure on page
Chapter 1 Install the Shelf and Backplane Cable
"DLP-A24 Install DS-1 AMP Champ
17-31.
as needed for routing the
as needed.
as needed.
as needed.
as needed.
1-23.
78-18537-01

Advertisement

Table of Contents
loading

Table of Contents