Mounting / Dismantling; Mounting; Dismantling - ABB free@home SUG-F-1.1 Product Manual

Split unit gateway
Table of Contents

Advertisement

6.2

Mounting / dismantling

6.2.1

Mounting

The device is suitable for installation in flush-mounted or surface-mounted boxes.
The device can be mounted in any position.
Maintain a maximum distance of 2 m to the Split Unit.
1. Pull off the adhesive label and glue it into the list (see system manual System Access
Point).
2. The bus connection is established by means of the enclosed bus connection terminal.
3. The connection to the Split Unit is established with the enclosed IR cable. Plug the IR cable
into the socket of the gateway and glue the transmission unit to the reception part of the
Split Unit with the aid of the double-sided adhesive tape.
Notice
The device is ready for operation after the bus voltage and, if required, an auxiliary voltage has
been applied.
Notice
6.2.2

Dismantling

Dismantling is carried out in the reverse order to mounting.
 
Product manual 9AKK107680A2816
The surfaces must be clean, free of grease and have a temperature of at
least 10 °C.
The description of the terminals is located on the housing.
Ensure the cables have strain relief.
Access to the device must be guaranteed for operation, testing, inspection,
for maintenance and repairs according to DIN VDE 0100-520.
Instructions for mounting the supplied infrared cable are located in the
associated mounting and operating manual.
Connection, installation / mounting
│18