Commissioning

7.1

Requirements for commissioning

A System Access Point is required to make the device operational. The device is ready when
the bus voltage is applied.
7.2

Initial commissioning

Commissioning is always carried out via the Web-based surface of the System Access Point.
The System Access Point establishes the connection between the ABB-free@home
participants and the smartphone, tablet or PC. It is used to identify and program the participants
during commissioning.
Devices which are physically connected to the ABB-free@home
automatically into the System Access Point. They transmit information about their type and
supported functions (see table "Overview of functions" on page 12).
During initial commissioning all devices are given a generic name (e.g. Split Unit Gateway, etc.).
The user can change this name to a name practical for the system (Example: "Split Unit living
room").
The devices must be parameterised for the use of additional functions.
Commissioning of the Split Unit Gateway is described in the following chapters. Here it is
assumed that the basic commissioning steps of the overall system have already been carried
out. General knowledge about the Web-based commissioning software of the System Access
Point is assumed.
Notice
General information about commissioning and parameterization is available in
the system manual and in the technical reference manual of the "System Access
Point" at www.abb.com/freeathome.
 
Product manual 9AKK107680A2816
Commissioning
®
®
bus, log themselves
│20

Advertisement

Table of Contents
loading

Table of Contents