" to 6" COMBO CHANGE OVER CHECK LIST
5
1.
___ UNPLUG MACHINE:
Eliminate electrical power source.
2.
___ REMOVE COVERS:
Remove covers containing quick-release fasteners.
3.
___ REMOVE GUILLOTINE:
Remove 5" guillotine from machine.
4.
___ MOVE BEAD ROLLER ASSEMBLY:
Loosen and slide bead roller assembly into 6" position
5.
___ REMOVE BACK BELL ROLLER:
Remove from 5" position, and set it to the side.
6.
___ MOVE BACK GUIDE ROD:
Loosen guide rod bolts, and slide guide rod away from skate.
7.
___ FLIP TOP #3 EXIT DRIVE ROLLER:
Remove & reinstall top #3 back drive roller in 6" position.
Turn roller end-for-end and reinstall using same 82-degree cap screws.
8.
___ INSTALL BACK BELL WHEEL:
Install back bell wheel in the 6" position.
9.
___ INSTALL 6" GUILLOTINE:
Install 6" guillotine on machine.
10. ___ SECURE 5" GUILLOTINE:
Place the 5" guillotine back into storage position.
11. ___ MOVE SKATE ROLLERS:
Pull retractable pins on skate rollers and move outward to 6" position.
12. ___ MOVE ENTRANCE GUIDES:
Loosen cap screw on both entrance guides, and move outward to stop at 6" position.
13. ___ MOVE FACE BOX ROLLERS:
Pull retractable pins and raise face box rollers to 6" position.
14. ___ MOVE COMPLETE LIP BOX:
Loosen mounting bolts and move lip box to 6" position.
15. ___ REMOVE 5" INSIDE ROLLER BAR FROM LIP BOX:
Remove red colored screws, remove roller bar and set to the side.
16. ___ MOVE LIP BOX BOTTOM ROLLERS:
Pull retractable pins and lower bottom half of the outside lip box roller to 6" position.
17. ___ INSTALL 6" INSIDE ROLLER BAR ASSEMBLY.
Remove 6" roller bar from storage position and install in lip box.
18. ___ STORE 5" INSIDE ROLLER BAR:
Secure 5" inside roller bar in storage position.
19. ___ REINSTALL COVERS:
Refasten covers and lids to machine.
20. ___ MOVE COIL SPOOL HALVES:
Position spool halves for 15" coil.
21. ___ MOVE UPRIGHT ASSEMBLY:
Move upright assembly to the 6" Position.