Preventative Maintenance; Preventative Maintenance Schedule - Thermo Scientific CryoExtra CE8100 Series Operating And Maintenance Manual

Liquid nitrogen storage system
Table of Contents

Advertisement

Preventative Maintenance

Preventative Maintenance
Schedule
This section describes the preventative maintenance that
should be performed on CryoExtra freezers to ensure
optimum operation and performance, as well as maximum
service life. As with any technical piece of laboratory
equipment, preventative maintenance is key to equipment
success.
Table 8. Periodic Preventative Maintenance Schedule
Level Verification
Verify Adequate Supply
Plumbing Leak Check
High Temp Alarm Test
Level Alarm Test
Thaw Freezer Lid
Folding Step Inspection
Lid Hinge Inspection
Inline Filter Replacement
Complete Function Test
Solenoid Valve Replacement
Relief Valve Replacement
Lid Gasket Replacement
Complete Freezer Thaw and
Moisture Removal
60 |
Preventative Maintenance
Note: This is the CryoExtra recommended preventative
maintenance. CryoExtra Distributors may have a more
comprehensive maintenance/service plan. At the minimum,
the below schedule should be followed.
Weekly
Monthly
X
X
X
6
12
Months
Months
X
X
X
X
X
X
X
Thermo Fisher Scientific CryoExtra CE8100 Series
24
60
Months
Months
X
X
X
X

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents