2.4 Data Requirements

This topic describes the data requirements for the commissioning. The information about
hardware configuration, networking, and data plan must be available for data configuration.
Checklist
Before the commissioning, collect the information about the hardware configuration,
networking, and data plan based on the engineering documents such as the project division layout
and network design.
Table 2-4 Checklist
No.
1
Issue 04 (2012-06-25)
Item
Description
Straight through cable
Tail fiber
Maintain
(Generally) Portable computer with
ing
HyperTerminal application
terminal
Auxiliar
Optical power meter
y device
and
meter
Adjustable optical attenuator
Multimeter
Table 2-4
provides the data requirement checklist.
Item
Hardware
configuration
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Remarks
Used for commissioning the
services.
Used for detecting the optical
power and optical sensitivity, and
transmitting the service upstream.
Used for logging in to the
UA5000 to commission the
UA5000.
Used for the following tests on the
optical port: actual receive optical
power test, receive sensitivity test,
and overload optical power test.
Used on the optical signal receive
port for attenuating the received
optical signal during the device
commissioning to protect the
optical port from being damaged by
strong optical power.
Used for measuring the voltage,
resistance, and current intensity
during the power commissioning.
Description
It includes but is not limited to:
l The type of the control board and other boards, and the
slot layout.
l The type of the uplink port and service port, and their
physical locations.
2 Commissioning Preparations