Huawei UA5000 Commissioning Manual page 45

Universal access unit product
Hide thumbs Also See for UA5000:
Table of Contents

Advertisement

UA5000 Universal Access Unit Product
Commissioning Guide-PVM CLI
Figure 3-17 Flowchart for logging in to and configuring the UA5000 through the outband
management port in telnet mode
Configure IP address of
maintenance network port
Run the telnet program
Run the telnet program
Procedure
Step 1 Set up the configuration environment.
l If you log in to the UA5000 in the LAN outband management mode through telnet, set up a
l If you log in to the UA5000 in the WAN outband management mode through telnet, set up
Step 2 Configure the IP addresses of the maintenance network port.
In outband mode, you can run the ip address command to configure the IP address of the
maintenance network port.
huawei(config)#interface outband
huawei(interface-outband)#ip address 10.10.20.10 255.255.255.0 10.10.20.1 vlan_tag
1
huawei(interface-outband)#exit
Step 3 Configure an outband route.
In the case that PVMD functions as the control board, if the IP address of the maintenance
terminal and that of the maintenance network port on the UA5000 are not in the same network
segment, run the outband route add command in diagnose mode to create an outband route
from the UA5000 to the maintenance terminal.
huawei(config)#diagnose
huawei(diagnose)%%outband route add 10.10.1.0 255.255.255.0
huawei(diagnose)%%config
Issue 04 (2012-06-25)
Start
Set up configuration
environment
Log in to the system
End
network environment according to the networking shown in
a network environment according to the networking shown in
NOTE
Skip this step when PVMB functions as the control board.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Stand-Alone Commissioning
Figure
3-15.
Figure
3-16.
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents