Start-Up; Safety Instructions For Commissioning; Starter Software - Siemens SINAMICS SM150 Operating Instructions Manual

Medium-voltage drive
Table of Contents

Advertisement

Start-up

7.1

Safety instructions for commissioning

When carrying out any work, carefully observe the information provided in Chapter "Safety
instructions".
Material damage caused by transport indicators that have become loose
In operation, as a result of high temperatures, the transport indicators can become detached
and fall into the device. Material or temperature damage may result.
● Remove the transport indicators before commissioning. Remove any adhesive residue from
Danger to life as a result of incorrect commissioning
Malfunctions can occur as a result of incorrect commissioning or incorrect parameterization.
Premature failures and subsequent damage to the drive system can result in death, serious
injury or material damage. Incorrectly performed commissioning can result in the warranty
becoming null and void.
● Never commission the device if it is dirty or polluted. Immediately contact Customer
● This device may only be commissioned by electrically skilled persons who have been
● Obtain information about the range of SITRAIN training courses available through your
7.2

STARTER software

STARTER software is used to commission the converter. You perform the following using
STARTER:
● Commissioning
● Testing
SINAMICS SM150 6SL3845-7NN42-2AA3 HBIS Shigang WRM NTM
Operating Instructions Rev.202003051222 3005356504
the transport indicators using methylated spirits.
WARNING
Support. You can find the relevant contact person under "Service & Support (Page 155)".
adequately trained on this product, and have experience with commissioning this product
and the associated plant and system components. The electrical technician
commissioning the equipment must be trained on the specific product as a result of the
differences between the individual products, e.g. regarding topology and closed-loop
control.
local contact person. Make use of the support and services offered by the responsible
Siemens Service Center when commissioning this equipment. You can find the relevant
contact person under "Service & Support (Page 155)".
7
85

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents