Toshiba RAS-B07J2KVSG-E Service Manual page 118

Split type
Hide thumbs Also See for RAS-B07J2KVSG-E:
Table of Contents

Advertisement

12-2. Outdoor unit (RAS-07, 10, 13J2AVSG-E)
No.
Part name
1
Common procedure
Procedures
1. Detachment
NOTE
Wear gloves for this job.
Otherwise, you may injure your hands on
the parts, etc.
1) Stop operation of the air conditioner, and
turn off the main switch of the breaker for air
conditioner.
2) Remove the valve cover.
(ST2TØ4 × 10L 2 pcs.)
After removing screw, remove the valve
cover pulling it downward.
3) Remove cord clamp (ST2TØ4 × 14L 3 pcs.),
and then remove connecting cable.
4) Remove the upper cabinet.
(ST2TØ4 × 10L 5 pcs.)
After removing screws, remove the upper
cabinet pulling it upward.
2. Attachment
1) Attach the upper cabinet.
(ST2TØ4 × 10L 5 pcs.)
2) Perform cabling of connecting cable, and
attach the cord clamp.
Fix the cord clamp by tightening the
screws (ST2TØ4 x 14L 3 pcs.), fitting 2
concave parts of the cord clamp to each
connecting cables.
3) Attach the valve cover.
(ST2TØ4 x 10L 2 pcs.)
Insert the upper part into the square hole
of the side cabinet, set hook claws of the
valve cover to square holes (at three
positions) of the main unit, and attach it
pushing upward,
- 118 -
Remarks
Upper cabinet
Terminal cover
Valve cover
Upper cabinet

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents