Step 5. Start Up The Analyzer - Agilent Technologies PNA Series Installation And Quick Start Manual

Network analyzers
Hide thumbs Also See for PNA Series:
Table of Contents

Advertisement

Installing Your Analyzer

STEP 5. Start Up the Analyzer

STEP 5. Start Up the Analyzer
CAUTION
Install the instrument so that the detachable power cord is readily
identifiable and is easily reached by the operator. The detachable power cord
is the instrument disconnecting device. It disconnects the mains circuits from
the mains supply before other parts of the instrument. The front panel switch
is only a standby switch and is not a LINE switch. Alternatively, an
externally installed switch or circuit breaker (which is readily identifiable
and is easily reached by the operator) may be used as a disconnecting device.
1. Connect the AC power cable.
2. Turn the analyzer on by pressing the front panel On/Off switch. When the analyzer is
turned on, the On/Off switch changes color from yellow to green.
CAUTION
Do NOT press keys on the front panel, rotate the RPG knob, or connect a
USB device during boot up of Windows or of the PNA application program.
Doing so may lead to a front panel lockup state.
2-8
E8356-90001

Advertisement

Table of Contents
loading

Table of Contents