Wiring Requirements; Main Electrical Power; Requirements; Field Installed Control Wiring - Trane RAUJ-C20 Installation, Operation And Maintenance Manual

Split system
Table of Contents

Advertisement

Wiring Requirements

Main Electrical Power Requirements
W W A A R R N N I I N N G G
P P r r o o p p e e r r F F i i e e l l d d W W i i r r i i n n g g a a n n d d G G r r o o u u n n d d i i n n g g
R R e e q q u u i i r r e e d d ! !
F F a a i i l l u u r r e e t t o o f f o o l l l l o o w w c c o o d d e e c c o o u u l l d d r r e e s s u u l l t t i i n n d d e e a a t t h h o o r r
s s e e r r i i o o u u s s i i n n j j u u r r y y . .
A A l l l l f f i i e e l l d d w w i i r r i i n n g g M M U U S S T T b b e e p p e e r r f f o o r r m m e e d d b b y y q q u u a a l l i i f f i i e e d d
p p e e r r s s o o n n n n e e l l . . I I m m p p r r o o p p e e r r l l y y i i n n s s t t a a l l l l e e d d a a n n d d g g r r o o u u n n d d e e d d
f f i i e e l l d d w w i i r r i i n n g g p p o o s s e e s s F F I I R R E E a a n n d d E E L L E E C C T T R R O O C C U U T T I I O O N N
h h a a z z a a r r d d s s . . T T o o a a v v o o i i d d t t h h e e s s e e h h a a z z a a r r d d s s , , y y o o u u M M U U S S T T f f o o l l l l o o w w
r r e e q q u u i i r r e e m m e e n n t t s s f f o o r r f f i i e e l l d d w w i i r r i i n n g g i i n n s s t t a a l l l l a a t t i i o o n n a a n n d d
g g r r o o u u n n d d i i n n g g a a s s d d e e s s c c r r i i b b e e d d i i n n N N E E C C a a n n d d y y o o u u r r l l o o c c a a l l / /
s s t t a a t t e e / / n n a a t t i i o o n n a a l l e e l l e e c c t t r r i i c c a a l l c c o o d d e e s s . .
Verify the power supply meets the required power
requirements of the system.
Install power wiring in accordance with all
applicable codes.
Install and connect properly sized power supply
wiring, with over current protection, to the main
power terminal block (1TB1) or to an optional
factory mounted non-fused disconnect switch (1S1)
in the control panel.
Install and connect properly sized power supply
wiring, with over current protection, to the proper
termination point in the air handling unit (If
applicable).
Install proper grounding wires to an earth ground.
For EVP units only, install and connect properly
sized power supply wiring, with overcurrent
protection, to the proper termination point for the
chilled solution pump.

Field Installed Control Wiring

Requirements

W W A A R R N N I I N N G G
H H a a z z a a r r d d o o u u s s V V o o l l t t a a g g e e ! !
F F a a i i l l u u r r e e t t o o d d i i s s c c o o n n n n e e c c t t p p o o w w e e r r b b e e f f o o r r e e s s e e r r v v i i c c i i n n g g c c o o u u l l d d
r r e e s s u u l l t t i i n n d d e e a a t t h h o o r r s s e e r r i i o o u u s s i i n n j j u u r r y y . .
D D i i s s c c o o n n n n e e c c t t a a l l l l e e l l e e c c t t r r i i c c p p o o w w e e r r , , i i n n c c l l u u d d i i n n g g r r e e m m o o t t e e
d d i i s s c c o o n n n n e e c c t t s s b b e e f f o o r r e e s s e e r r v v i i c c i i n n g g . . F F o o l l l l o o w w p p r r o o p p e e r r
l l o o c c k k o o u u t t / / t t a a g g o o u u t t p p r r o o c c e e d d u u r r e e s s t t o o e e n n s s u u r r e e t t h h e e p p o o w w e e r r
c c a a n n n n o o t t b b e e i i n n a a d d v v e e r r t t e e n n t t l l y y e e n n e e r r g g i i z z e e d d . . V V e e r r i i f f y y t t h h a a t t n n o o
p p o o w w e e r r i i s s p p r r e e s s e e n n t t w w i i t t h h a a v v o o l l t t m m e e t t e e r r . .
SS-SVX11K-EN
W W A A R R N N I I N N G G
P P r r o o p p e e r r F F i i e e l l d d W W i i r r i i n n g g a a n n d d G G r r o o u u n n d d i i n n g g
R R e e q q u u i i r r e e d d ! !
F F a a i i l l u u r r e e t t o o f f o o l l l l o o w w c c o o d d e e c c o o u u l l d d r r e e s s u u l l t t i i n n d d e e a a t t h h o o r r
s s e e r r i i o o u u s s i i n n j j u u r r y y . .
A A l l l l f f i i e e l l d d w w i i r r i i n n g g M M U U S S T T b b e e p p e e r r f f o o r r m m e e d d b b y y q q u u a a l l i i f f i i e e d d
p p e e r r s s o o n n n n e e l l . . I I m m p p r r o o p p e e r r l l y y i i n n s s t t a a l l l l e e d d a a n n d d g g r r o o u u n n d d e e d d
f f i i e e l l d d w w i i r r i i n n g g p p o o s s e e s s F F I I R R E E a a n n d d E E L L E E C C T T R R O O C C U U T T I I O O N N
h h a a z z a a r r d d s s . . T T o o a a v v o o i i d d t t h h e e s s e e h h a a z z a a r r d d s s , , y y o o u u M M U U S S T T f f o o l l l l o o w w
r r e e q q u u i i r r e e m m e e n n t t s s f f o o r r f f i i e e l l d d w w i i r r i i n n g g i i n n s s t t a a l l l l a a t t i i o o n n a a n n d d
g g r r o o u u n n d d i i n n g g a a s s d d e e s s c c r r i i b b e e d d i i n n N N E E C C a a n n d d y y o o u u r r l l o o c c a a l l / /
s s t t a a t t e e / / n n a a t t i i o o n n a a l l e e l l e e c c t t r r i i c c a a l l c c o o d d e e s s . .
115 Volt Control Wiring (All Units)
Verify that the Control transformer (1T1) is wired for
the proper operating voltage.
Connect properly sized wiring to the liquid line
solenoid valve(s).
The phase monitor (1U3) when powered with line
voltage properly phased and balanced has a green
LED energized.
Connect properly sized wiring to the hot gas bypass
solenoid valve(s), if applicable, to operate with the
unit. Refer to the unit wiring diagram that shipped
with the unit.
Install the interlock circuitry wiring for the air
handling unit to permit compressor operation after
the fan has started, i.e., proof of fan operation
device, fan starter auxiliary contacts or pump
starter station, pump starter auxiliary contacts,
proof of flow device, etc. Refer to the field
connection diagram that shipped with the unit for
interlocking information.
Install properly sized power supply wiring, with
over current protection, to the proper termination
point for the field provided economizer actuator(s),
if applicable. Refer to the "Economizer Actuator
Circuit" illustrated in the "Field Installed Control
Wiring" section.
"No Controls" Units
A field provided "step" controller must be installed
and properly wired. (Controller will have 2, 4 or 6
steps, depending on unit configuration.) Refer to
the field connection diagram for connection
information.
Install proper grounding wires to an earth ground.
Install an outside air thermostat in series with the
flow switch to stop or prevent the unit from
operating below the recommended ambient
temperatures.
EVP Chiller Units
Install proper grounding wires to an earth ground.
I I n n s s t t a a l l l l a a t t i i o o n n E E l l e e c c t t r r i i c c a a l l
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents