Trane RAUJ-C20 Installation, Operation And Maintenance Manual page 19

Split system
Table of Contents

Advertisement

Figure 8. Air-cooled condensing unit connections — 25 and 30 tons
CONTROL PANEL SIDE
SUCTION LINE
Horizontal
25T: 2 1/8" O.D.
30T: 2 1/8" O.D.
Vertical
25T: 1 5/8" O.D.
30T: 2 1/8" O.D.
16 9/16"
7 9/16"
5 11/16"
PLAN VIEW OF UNIT
CONNECTION DRAWING
COIL
F RONT
F RONT
C
C
A A
A A
A
A
C
C
A A
A A
SUCTION LINE
CONTROL PANEL SIDE VIEW OF UNIT
CONNECTION DRAWING
SS-SVX11K-EN
7/8" O.D. HOT GAS
BYPASS (OPTIONAL)
COMPRESSORS
7/8" O.D.
LIQUID LINE
34 1/2"
23 1/2"
SERVICE VALVE (OPTIONAL)
LIQUID LINE
25 - 30 TON UNIT
DIMENSIONAL CONNECTION DRAWING
D D i i m m e e n n s s i i o o n n s s a a n n d d W W e e i i g g h h t t s s
NOTES:
1. VERIFY WEIGHT, CONNECTION, AND ALL DIMENSION WITH
INSTALLER DOCUMENTS BEFORE INSTALLATION
CONTROL PANEL
SCA LE 1.000
ORIENTATION VIEW OF UNIT
ISOMETRIC DRAWING
SUCTION LINE
HOT GAS BYPASS (OPTIONAL)
BACK VIEW OF UNIT
CONNECTION DRAWING
VOLTAGE ACCESS
COIL
F RONT
F RONT
C
C
A
A
A
A
A
A
C
C
18 9/16"
A A
A A
LIQUID LINE
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents