Trane RAUJ-C20 Installation, Operation And Maintenance Manual page 67

Split system
Table of Contents

Advertisement

W W A A R R N N I I N N G G
P P r r o o p p e e r r F F i i e e l l d d W W i i r r i i n n g g a a n n d d G G r r o o u u n n d d i i n n g g
R R e e q q u u i i r r e e d d ! !
F F a a i i l l u u r r e e t t o o f f o o l l l l o o w w c c o o d d e e c c o o u u l l d d r r e e s s u u l l t t i i n n d d e e a a t t h h o o r r
s s e e r r i i o o u u s s i i n n j j u u r r y y . .
A A l l l l f f i i e e l l d d w w i i r r i i n n g g M M U U S S T T b b e e p p e e r r f f o o r r m m e e d d b b y y q q u u a a l l i i f f i i e e d d
p p e e r r s s o o n n n n e e l l . . I I m m p p r r o o p p e e r r l l y y i i n n s s t t a a l l l l e e d d a a n n d d g g r r o o u u n n d d e e d d
f f i i e e l l d d w w i i r r i i n n g g p p o o s s e e s s F F I I R R E E a a n n d d E E L L E E C C T T R R O O C C U U T T I I O O N N
h h a a z z a a r r d d s s . . T T o o a a v v o o i i d d t t h h e e s s e e h h a a z z a a r r d d s s , , y y o o u u M M U U S S T T f f o o l l l l o o w w
r r e e q q u u i i r r e e m m e e n n t t s s f f o o r r f f i i e e l l d d w w i i r r i i n n g g i i n n s s t t a a l l l l a a t t i i o o n n a a n n d d
g g r r o o u u n n d d i i n n g g a a s s d d e e s s c c r r i i b b e e d d i i n n N N E E C C a a n n d d y y o o u u r r l l o o c c a a l l / /
s s t t a a t t e e / / n n a a t t i i o o n n a a l l e e l l e e c c t t r r i i c c a a l l c c o o d d e e s s . .
Before installing any connecting wiring, see drawings
Dimensions and Weights chapter for the electrical
access locations provided on the unit. Install
appropriately sized control wiring for the 115 volt
electrical components as required by the application.
Since the unit-mounted 115V control power
transformer (1T1) is provided on all units, it is not
necessary to run a separate 115 volt control power
source to the unit.
N N o o t t e e : : All 200/230V units are shipped with transformer
1T1 wired for 200 volt operation. If the unit is to
be operated on a 230V power supply, rewire the
transformer as shown on the unit schematic.
N N o o t t e e : : All field wiring must conform to NEC guidelines
as well as state and local codes.
Controls Wiring — 115 VAC
W W A A R R N N I I N N G G
H H a a z z a a r r d d o o u u s s V V o o l l t t a a g g e e ! !
F F a a i i l l u u r r e e t t o o d d i i s s c c o o n n n n e e c c t t p p o o w w e e r r b b e e f f o o r r e e s s e e r r v v i i c c i i n n g g c c o o u u l l d d
r r e e s s u u l l t t i i n n d d e e a a t t h h o o r r s s e e r r i i o o u u s s i i n n j j u u r r y y . .
D D i i s s c c o o n n n n e e c c t t a a l l l l e e l l e e c c t t r r i i c c p p o o w w e e r r , , i i n n c c l l u u d d i i n n g g r r e e m m o o t t e e
d d i i s s c c o o n n n n e e c c t t s s b b e e f f o o r r e e s s e e r r v v i i c c i i n n g g . . F F o o l l l l o o w w p p r r o o p p e e r r
l l o o c c k k o o u u t t / / t t a a g g o o u u t t p p r r o o c c e e d d u u r r e e s s t t o o e e n n s s u u r r e e t t h h e e p p o o w w e e r r
c c a a n n n n o o t t b b e e i i n n a a d d v v e e r r t t e e n n t t l l y y e e n n e e r r g g i i z z e e d d . . V V e e r r i i f f y y t t h h a a t t n n o o
p p o o w w e e r r i i s s p p r r e e s s e e n n t t w w i i t t h h a a v v o o l l t t m m e e t t e e r r . .
Install appropriately sized 115 volt control wiring for
the electrical components as required by the
application.
These components may include:
Hot gas bypass solenoid wiring
Supply fan interlock and control circuit
System control switch wiring ("No Control" units)
Step controller wiring ("No Control" units)
Chilled water pump interlock wiring (EVP units)
Chilled water flow switch wiring (EVP units)
Outside air thermostat wiring (EVP units)
Liquid line solenoid valve(s)
SS-SVX11K-EN
Supply Fan Interlock
Control Options Utilizing an Air Handler
The normally open evaporator fan interlock auxiliary
contacts and the evaporator fan controls; system On/
Off switch, fan starter/contactor, and overloads, must
be wired as illustrated in the appropriate interlock
connection wiring diagram for the specified
application.
EVP Flow control (6S58)
The flow switch is a binary output device and must be
wired within the interlock circuit. Before installing the
control wiring, refer to the remote panel illustration for
the electrical access into the panel. Refer to the field
connection diagram for the specific connection points
inside the remote panel.
EVP Circulating Pump Interlock
Pump operation and sequence is the responsibility of
the installer. During compressor operation, the fluid
flow through the chiller must be maintained. The field
provided; ON/OFF switch, pump starter/contactor,
auxiliary contacts and overloads (OLs) must be
installed as part of the system's interlock circuit to
disable the compressors in the event the circulating
pump shuts down or is turned off.
N N o o t t e e : : Due to the location of the 5S1 switch within the
circulating pump control circuit, it can be used as
a system ON/OFF switch.
Outside Air Thermostat (5S57)
A field provided outside air thermostat must be
installed within the interlock circuit to prevent the
system from operating below its workable temperature
range. Before installing the control wiring, refer to the
remote panel illustration for the electrical access into
the panel. Refer to the field connection diagram for the
specific connection points inside the remote panel.
Refer to the "EVP Chiller Controls" section for
temperature requirements.
Hot Gas Bypass (All control options)
If hot gas bypass is required, refer to the "Refrigerant
Piping" illustration for supporting equipment tubing
connections. Refer to the specific control option field
connection diagram terminal connections for the hot
gas bypass solenoid coils.
Controls Wiring — 24 VAC
W W A A R R N N I I N N G G
H H a a z z a a r r d d o o u u s s V V o o l l t t a a g g e e ! !
F F a a i i l l u u r r e e t t o o d d i i s s c c o o n n n n e e c c t t p p o o w w e e r r b b e e f f o o r r e e s s e e r r v v i i c c i i n n g g c c o o u u l l d d
r r e e s s u u l l t t i i n n d d e e a a t t h h o o r r s s e e r r i i o o u u s s i i n n j j u u r r y y . .
D D i i s s c c o o n n n n e e c c t t a a l l l l e e l l e e c c t t r r i i c c p p o o w w e e r r , , i i n n c c l l u u d d i i n n g g r r e e m m o o t t e e
d d i i s s c c o o n n n n e e c c t t s s b b e e f f o o r r e e s s e e r r v v i i c c i i n n g g . . F F o o l l l l o o w w p p r r o o p p e e r r
l l o o c c k k o o u u t t / / t t a a g g o o u u t t p p r r o o c c e e d d u u r r e e s s t t o o e e n n s s u u r r e e t t h h e e p p o o w w e e r r
c c a a n n n n o o t t b b e e i i n n a a d d v v e e r r t t e e n n t t l l y y e e n n e e r r g g i i z z e e d d . . V V e e r r i i f f y y t t h h a a t t n n o o
p p o o w w e e r r i i s s p p r r e e s s e e n n t t w w i i t t h h a a v v o o l l t t m m e e t t e e r r . .
I I n n s s t t a a l l l l a a t t i i o o n n E E l l e e c c t t r r i i c c a a l l
67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents