Download Print this page

Stationary Installation - Omron BUM100R Instruction Manual

Battery unit

Advertisement

2-1-2. Stationary installation

Perform installation only as shown in the diagrams below.
● Horizontal installation
Attach the included rubber feet for horizontal installation (14.5 mm depth) to the round stickers on the
unit (4 locations) and position the unit horizontally.
For stationary horizontal installation, make sure that this product does not slide or fall.
Install the UPS (BU100RW/BU200RW/BU300RW) so that it sits on top of the additional battery unit
(BUM100R/BUM300R).
BU100RW
BUM100R
BU200RW/
BU300RW
BUM300R
Do not slide the unit when the rubber feet are touching the fl oor.
● Upright installation
Use the stand that was included with the UPS (BU100RW/BU200RW/BU300RW).
Attach the 4 rubber feet for vertical placement (height: 1.7mm) to the 4 points on the bottom surface
(see diagram below).
(Attach the rubber feet included with the UPS to the 4 points on the bottom surface of the unit.
Attach one rubber foot included with the UPS to the bottom surface of each piece of the vertical
stand.)
Caution
Free-standing installation
When positioning the unit vertically, use the fi xing brackets for the vertical stand included with the unit.
When positioning the unit horizontally, attach the rubber feet to the bottom surface of the unit to pre-
vent it from sliding or falling.
BATTERY UNIT
BU300RW
16
BUM300R

Advertisement

loading

This manual is also suitable for:

Bum300r