4. Push the VALVES switch to the ON position.
5. Check for leaks.
6. Push the LIGHTS switch to the ON position to activate merchandiser LEDs.
4. RATIO/BRIX
The Schroeder America Dispenser has been thoroughly tested and sanitized prior to shipment. The
installer will be required to ratio/brix the dispenser.
Water valve has been pre-set and capped to flow at 1.67 oz/s.
DO NOT ADJUST WATER VALVE, ONLY ADJUST SYRUP VALVES.
A. Remove nozzle by twisting clockwise and pull down.
B. Install Schroeder America Syrup Separator (P.N.: 316-0004) in place of nozzle to set ratio.
Membrane Switch (Fig. 4.1) is used to actuate the syrup and water solenoid valves.
The Ribbon Cable (Fig. 4.2) connects the Membrane Switch and PCB Assembly
and has a locking tab. (Push tab down to release cable from membrane switch)
The PCB Assembly (Fig. 4.3), in the unit, indicates the locations of corresponding valves.
Fig. 4.1 (Front of Unit)
4
3
1
2
Button
Valves Activated
1
1 & 5
2
2 & 5
3
3 & 5
4
4 & 5
6
NOTE:
NOTE:
Fig. 4.2 (Front of Unit,
Merchandiser Removed)
LOCKING
TAB
Fig. 4.3 (Top of Unit)
Solenoid Valves
1
2
3
4
5 (Water)