NTP- F108 Unpack and Inspect the ONS 15600 SDH Bay Assembly
Test Equipment
NTP-F108 Unpack and Inspect the ONS 15600 SDH Bay Assembly
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
Complete the
Step 2
Continue with the
Step 3
Stop. You have completed this procedure.
Cisco ONS 15600 SDH Procedure Guide, R8.0
1-4
6-inch (154.2 mm) (or greater) ratchet extension (optional)
3/4-inch (19.05 mm) socket
1 1/8-inch (28.575 mm) socket
15/16-inch (23.8125 mm) socket
7/16-inch (11.1125 mm) nut driver or socket
9/64-inch (3.5719 mm) Allen wrench
Voltmeter
Visible laser source
Optical power meter
This procedure explains how to unpack the ONS 15600 SDH and verify the
contents.
Scissors
Phillips screwdriver
3/4-inch (19.05 mm) socket wrench
Required
Onsite
None
"DLP-F161 Unpack and Verify the Bay Assembly" task on page
"DLP-F162 Inspect the Bay Assembly" task on page
"NTP-F109 Install the Bay Assembly" procedure on page
Chapter 1 Install the Bay and Backplane Connections
16-1.
16-3.
1-5.