NTP- F117 Perform the Bay Installation Acceptance Test
Table 1-1
Description
NTP-F112 Install Cable Routing Modules and Kick Plates, page 1-9
NTP-F113 Install the Bay Power and Ground, page 1-10
NTP-F114 Remove the Rear Cover, page 1-11
NTP-F115 Install Wires to Alarm, Timing, LAN, and Craft Pin Connections, page 1-12
NTP-F116 Replace the Rear Cover, page 1-13
Complete the
Step 2
Stop. You have completed this procedure.
Cisco ONS 15600 SDH Procedure Guide, R8.0
1-14
ONS 15600 SDH Bay Installation Task Summary (continued)
"DLP-F173 Inspect the Bay Installation and Connections" task on page
Chapter 1 Install the Bay and Backplane Connections
Completed
16-17.