NTP- F115 Install Wires to Alarm, Timing, LAN, and Craft Pin Connections
Grasp the cover on each side and slide it to the left so it is free of the key holes.
Step 2
Pull the cover away from the bay.
Step 3
Continue with the
Step 4
procedure on page
Stop. You have completed this procedure.
NTP-F115 Install Wires to Alarm, Timing, LAN, and Craft Pin
Connections
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Caution
This equipment is suitable for intrabuilding wiring only.
Complete the
Step 1
Alarm wires are necessary to create external alarms and controls.
Step 2
Complete the
page 16-15
Step 3
Complete the
cables (or the LAN port on the Timing and Shelf Controller [TSC] card) are necessary to create an
external LAN connection.
Complete the
Step 4
cables (or the RJ-45 port on the TSC) are required to access TL1.
Always use the supplied ESD wristband when working with a powered ONS 15600 SDH. Plug the
Caution
wristband cable into either the ESD jack located on the lower-left outside edge of the bay assembly, or
the other ESD jack located at the bottom rear of the shelf.
Complete the
Step 5
Continue with the
Step 6
Stop. You have completed this procedure.
Cisco ONS 15600 SDH Procedure Guide, R8.0
1-12
"NTP-F115 Install Wires to Alarm, Timing, LAN, and Craft Pin Connections"
1-12.
This procedure explains how to install alarm, timing, LAN, and craft wires.
Wire-wrap tool (suitable for #22 to #28 AWG alarm wires)
#22 or #24 AWG alarm wires
NTP-F113 Install the Bay Power and Ground, page 1-10
As needed
Onsite
None
"DLP-F391 Install Alarm Wires on the CAP/CAP2" task on page 18-105
"DLP-F170 Install T1 (100 Ohm) Timing Connections on the CAP/CAP2" task on
if you are using a 100-ohm T1 building integrated timing supply (BITS) timing source.
"DLP-F171 Install LAN Cables on the CAP/CAP2" task on page 16-16
"DLP-F172 Install the TL1 Craft Interface Cable" task on page 16-16
"NTP-F116 Replace the Rear Cover" procedure on page
"NTP-F117 Perform the Bay Installation Acceptance Test" procedure on page
Chapter 1 Install the Bay and Backplane Connections
as needed. Craft
1-13.
as necessary.
as needed. LAN
1-13.
November 2009