Crosswater Waldorf US-WF0613 Installation Instructions

23-5/8" basin & pedestal base

Advertisement

Waldorf 23-5/8" Basin
Waldorf Pedestal Base
Installation Instructions
Introduction
All parts have been fully inspected throughout the production
process and only leaves our factory after a 15-stage QC process.
Carefully remove the items from the box and check that all parts have
been supplied.
Installation should be completed by at least two suitably competent
installers
Before beginning installation, please check for any damage that may
have occurred during transport. Note: Damage claims cannot be
made during or after installation.
Improper installation shall result in loss of warranty in case of
damage caused by impacts or rubbing against rough surfaces.
Wall fixings are not supplied. Source fixings which are suitable to the
site wall.
IMPORTANT: Please read these instructions carefully before
beginning and retain for future reference.
We do not accept responsibility for any problems that may occur
through incorrect installation.
Installation notes
The installation must comply with all plumbing codes including local
codes and be installed by a licensed plumbing contractor.
Assemble the parts on a mat to protect against scratching the surface.
Avoid getting cement, grit, sand or masonry products on to the surface.
Protect and cover the products during the installation period to
prevent damage from occurring.
IMPORTANT: Turn off the main water supply before connecting to
any existing pipework or doing any maintenance.
WARNING! Please check for any hidden pipes and cables, electric
or otherwise, before drilling holes in a wall or floor.
Tools required
Tape
Safety
measure
glasses
US-WF0613
US-WF0101
1
/
"
Hammer
4
drill
Dimensions
23-5/8"
11"
Flat head
screwdriver
21-5/8"
Pencil
Spirit
level

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Waldorf US-WF0613 and is the answer not in the manual?

Questions and answers

Summary of Contents for Crosswater Waldorf US-WF0613

  • Page 1: Tools Required

    Waldorf 23-5/8" Basin US-WF0613 Waldorf Pedestal Base US-WF0101 Installation Instructions Introduction Dimensions All parts have been fully inspected throughout the production 23-5/8" process and only leaves our factory after a 15-stage QC process. Carefully remove the items from the box and check that all parts have been supplied.
  • Page 2 Installation - pedestal Installation - pedestal l Install 2x6 backing behind the finished wall. lMark the center line on the floor. 36” 36” min Installation - pedestal Installation - pedestal l Set the basin on the pedestal and against the wall. Adjust the l Move the basin and pedestal aside.
  • Page 3 Installation - pedestal Installation - pedestal l Position the basin on the pedestal so the hanger bolts extend l Apply sealant. through the fixing holes. l Fit overflow cap. l Level and secure the basin using cap nuts and washers. DO NOT OVERTIGHTEN! Underside view of...
  • Page 4 Installation - wall Installation - wall l Mark the two basin fixing holes on the finished wall. l Drill 1/4” holes at the marked locations. l Install hanger bolts so they extend 11/2” beyond the finished wall. 11” ” Installation - wall Installation - wall l Position the basin on the hanger bolts through the fixing holes.
  • Page 5 Prolonged contact can alter surface finishes and void the warranty. Warranty - This Crosswater London product is covered by a limited lifetime warranty. For full details, terms and conditions please visit our website. For further information contact: Crosswater London, 393 Fortune Blvd., Milford, MA 01757 www.crosswaterlondon.com...

This manual is also suitable for:

Waldorf us-wf0101

Table of Contents