Crosswater Belgravia US-BL002 Installation Instructions

Crosswater Belgravia US-BL002 Installation Instructions

Floor-standing pillar legs

Advertisement

Belgravia Floor-standing Pillar Legs
US-BL002
Installation Instructions
Introduction
The floor-standing legs have been fully inspected throughout the
production process and only leaves our factory after a 15-step QC
process.
Carefully remove the floor-standing legs from the box and check that
all parts have been supplied.
Before beginning installation, please check for any damage that may
have occurred during transport. Note: Damage claims cannot be
made during or after installation.
Improper installation shall result in loss of warranty in case of damage
caused by impacts or rubbing against rough surfaces.
Prior to installing the floor-standing legs prepare a connection of water
inlet/outlet.
The customer may choose the type and location of the faucet,
installation instructions should be supplied by the faucet manufacturer.
IMPORTANT: Please read these instructions carefully before
beginning and retain for future reference.
We do not accept responsibility for any problems that may occur
through incorrect installation.
Installation notes
The installation must comply with all plumbing codes including local
codes and be installed by a licensed plumbing contractor.
Anti-scald protection is the responsibility of the installer and
according to applicable codes.
Install US-AA002ROUGH first using the instructions provided with
it.
IMPORTANT! Before installing a new faucet it is essential that the
supply pipes are thoroughly flushed in order to remove any remaining
debris, solder or other impurities. Failure to carry out this simple
procedure can cause problems or damage to the working of the
faucet. Installing shut-off valves on incoming supply lines is
recommended for ease of maintenance.
Turn off the main water supply before connecting to any existing
pipework or doing any maintenance.
WARNING! Please check for any hidden pipes and cables, electric
or otherwise, before drilling holes in a wall or floor.

Tools required

Tape
measure
Safety
Set
glasses
square
Dimensions
1
/
" NPSM
2
Pencil
Spirit
level
3-1/8"
7"
Silicone
sealant

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Belgravia US-BL002 and is the answer not in the manual?

Questions and answers

Summary of Contents for Crosswater Belgravia US-BL002

  • Page 1 Belgravia Floor-standing Pillar Legs US-BL002 Installation Instructions Introduction Dimensions The floor-standing legs have been fully inspected throughout the production process and only leaves our factory after a 15-step QC process. Carefully remove the floor-standing legs from the box and check that all parts have been supplied.
  • Page 2 Parts list Installation l Shut off the water heating system then, with the main water supply turned off, open the lowest hot and cold faucets and allow to drain SET SCREW until supply pipes are empty. l Identify all components before fitting. GASKET l Before installing the floor-standing legs, it is necessary to install the US-AA002ROUGH first.
  • Page 3 Installation FIXING SCREWS l Install the supports onto the rough. Line up the fixing screws and HEIGHT ADJUSTEMT ensure the small screw hole is facing the front, as shown opposite. SCREWS l There are 4 height adjustment screws located in the support. Use these to set the desired height of the support.
  • Page 4 Please see the website for care instructions for specific finishes. Warranty - This Crosswater London product is covered by a limited lifetime warranty. For full details, terms and conditions please visit our website. For further information contact: Crosswater London, 393 Fortune Blvd., Milford, MA 01757 www.crosswaterlondon.com...