H3C S6861 Series Installation Manual page 18

Hide thumbs Also See for S6861 Series:
Table of Contents

Advertisement

Figure 15 Attaching the mounting brackets and chassis rails (wide-spacing installation) to an
S6861-54QF (mounting brackets installed near the power module side)
Figure 16 Attaching the mounting brackets and chassis rails to an S6861-54QT switch
(mounting brackets installed near the power module side)
Connecting the grounding cable to the chassis
CAUTION:
Select a grounding point as required. The primary grounding point and auxiliary grounding point are
located on the left side panel. If you use one of these grounding points, you must connect the
grounding cable to the grounding point before you mount the switch in the rack.
This section uses the primary grounding point on an S6861-54QF switch as an example.
To connect the grounding cable to a grounding point:
Choose a grounding point. As a best practice, use the grounding point close to the mounting
1.
brackets.
Unpack the grounding cable and grounding screws.
2.
You can use the cable and screws shipped with the switch for connecting to the primary
grounding point or auxiliary grounding point.
Align the two-hole grounding lug at one end of the cable with the grounding holes of the
3.
grounding point, insert the grounding screws into the holes, and tighten the screws with a
screwdriver, as shown in
Figure
17.
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

S6861-54qfS6861-54qtS6861-30qf

Table of Contents