Quick start proceDure
14. Add a jumper lead from V
is approximately ½ of V
15. Set JP8 to 0, JP9 to 0 and JP10 to 0 and verify that
LDO_OUT is now 1.2V. Quickly remove PS1 + lead
from V
and verify that LDO_OUT remains at 1.2V
IN
for approximately 5 seconds.
16. Turn off PS1, PS2, LOAD1 and LOAD2.
to SCAP. Verify that BAL
OUT
.
OUT
Figure 3. Proper Measurement Equipment Setup
DEMO MANUAL DC2048A
dc2048af
5
Need help?
Do you have a question about the DC2048A and is the answer not in the manual?
Questions and answers