Air Flow; Inserting Fim And Fpm Modules - Fortinet FortiGate-7000E Series System Manual

Hide thumbs Also See for FortiGate-7000E Series:
Table of Contents

Advertisement

FortiGate-7040E hardware assembly and rack mounting
diagram. Finally line up the mid-mount trays with the mid-mount ears so that the chassis is supported in the rack. Then
use screws to attach the mid-mount ears and the chassis to the rack.
Mounting the chassis in a 2-post rack
M4x6 flat head
screws
Left mid mount tray
(attach to the rack
first)

Air flow

For rack installation, make sure that the amount of air flow required for safe operation of the FortiGate-7040E chassis is
not compromised. Make sure that the chassis ventilation openings at the front and back are not blocked by cables or
other components. The recommended minimum clearance at the front of the chassis is 100 mm and the recommended
clearance from the rear of the chassis is 100 mm. This results in a total footprint of 850 mm from front to back.

Inserting FIM and FPM modules

All FortiGate-7040E chassis are shipped with a protective front panel installed in the chassis to protect internal chassis
components. This panel must be removed before you install FIM and FPM modules.
Insert FIM modules into chassis slots 1 and 2. Insert FPM modules into chassis slots 3 and 4.
FortiGate-7040E System Guide
Left mid mount ear
(Attach to the
chassis)
Right mid mount tray
(attach to the rack first)
22
Right mid mount
ear (attach to the
chassis)
M4x6 flat head
screws