Paradyne FrameSaver SLV 9820-C Installation Instructions Manual page 15

Standalone unit
Table of Contents

Advertisement

Check that Data is Being Received
1. Return to the Main Menu.
2. Select Performance Statistics, and select an interface's frame relay statistics
(e.g., Network Frame Relay).
Main Menu
3. Verify that the Frames Received and Characters Received counts under the
Frame Relay Link statistics are incrementing, and there are no errors under the
Frame Relay LMI statistics.
– If count increments occur after refreshing the screen, the unit is receiving data.
– If data is not being received, recheck the cable connections, and replace or
repair a damaged cable. Recheck LMI status; you may need to contact your
service provider. Next, check the DLCI's status.
Check PVC Connections
Check PVC connections to verify that all PVCs, including management PVCs, are
configured, and to see whether the PVC is active or not.
1. Return to the Status menu.
2. Select PVC Connection Status.
The PVC Connection Status screen shows all PVC connections; the interface
source and DLCI number of the incoming data linked to the interface and DLCI
number for the outgoing data. You can also see whether the PVC is active.
3. Verify that each PVC is active.
– If active, the FrameSaver unit should be passing data.
– If not active, no data traffic can be carried by the PVC. If the PVC is configured
correctly, the circuit may be down.
The FrameSaver installation is complete.
In the User's Guide, see Displaying System Information for additional status
information, and Troubleshooting for additional troubleshooting information.
Status
Performance Statistics
Network Frame Relay
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Framesaver slv 9820

Table of Contents