Download Print this page

Kauber INCEILING XL Installation Manual page 6

In-ceiling projection screen

Advertisement

8. Cut the threaded rods to the right length (calculated using the formula below):
Rod length
9. After cutting the adequate lengths of the rods, screw them into the sockets in the mounting
brackets and then counter-lock with the M8 nuts (Figure 6).
Figure 6
10. Fit an M8 nut on each of the rods (to a distance of approximately 5-6 cm from the bottom end of
the rod) and then match the screen housing. If needed, adjust the nut position in a way to rest the
screen housing mounting brackets on the nuts, with the bottom plate of the housing pushed all the
way against the suspended ceiling panel.
Figure 7
Distance between the primary ceiling and
=
the bottom edge of the suspended ceiling
w
w
w .
k
a
u
b
e
r .
e
-6-
- 10 cm
u

Advertisement

loading