Planning your installation
The CPE200 is fastened to a prepared concrete pad using four anchor bolts (not supplied). The pad must be level
and flat and be a minimum of 2,500 PSI. The concrete pad must support the size and weight of the CPE200 and
comply with all applicable codes. Consult an engineer if necessary. For details on preparing the concrete pad,
see Appendix A.
DANGER: Do not install the CPE200 in a commercial car repair facility or within 20 feet (6 meters) of an
outdoor fuel dispensing device due to risk of explosion.
Charging cable proximity
When choosing the installation location, it is important to ensure the CPE200's charging plugs can easily reach
cars' charging ports without effort or strain on either end. The CPE200 charging cables can reach up to 10.5 feet
(3.2 meters).
Install the CPE200 at the end of a stall type parking space or island with pull through capability.
Do not install the CPE200 curbside on a roadway.
If installed at the end of a parking space, it can either be centered at the end of the parking space or positioned up
to 12" to the left as you face the rear of the space.
2
2 - 1
Need help?
Do you have a question about the Express 200 and is the answer not in the manual?