Geeetech Acrylic Prusa I3 Pro Assemble Instruction

Geeetech Acrylic Prusa I3 Pro Assemble Instruction

Hide thumbs Also See for Acrylic Prusa I3 Pro:

Advertisement

Quick Links

Assemble Instruction of Geeetech Acrylic Prusa I3
Pro & pro B

Advertisement

Table of Contents
loading

Summary of Contents for Geeetech Acrylic Prusa I3 Pro

  • Page 1 Assemble Instruction of Geeetech Acrylic Prusa I3 Pro & pro B...
  • Page 2: Table Of Contents

    Shenzhen GETECH CO.,LTD GEEETECH CONTENT CONTENT............................1 Safety Instructions..........................2 Preparation............................3 1 Unfold the box and check the package.................... 4 2 Assemble Y axis..........................7 2.1 Assemble the rods of a Y axis....................7 2.2 Assemble the Y idler......................11 2.3 Mount the Y motor......................14 2.4 Build the printing platform....................
  • Page 3: Safety Instructions

    Shenzhen GETECH CO.,LTD GEEETECH Safety Instructions Building the printer will require a certain amount of physical dexterity, common sense and a thorough understanding of what you are doing. We have provided this detailed instruction to help you assemble it easily.
  • Page 4: Preparation

    Shenzhen GETECH CO.,LTD GEEETECH Preparation 1. Unpack the kit and check if all parts are in the box and check the condition of each part, there might be some damage during shipping. To help you with this, there is BOM in the box and each bag was labeled with part number.
  • Page 5: Unfold The Box And Check The Package

    Shenzhen GETECH CO.,LTD GEEETECH 1 Unfold the box and check the package Unfold the package and take all the parts out to check the condition of the items. As you can see, all the parts are packed very carefully. www.geeetech.com...
  • Page 6 Shenzhen GETECH CO.,LTD GEEETECH  All the acrylic plate has been etched with part ID and the plate is covered with a sheet of kraft paper, you need to tear them off. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 7 Shenzhen GETECH CO.,LTD GEEETECH Tips: 1. Before assembly, you are advised to put all the parts, especially the screws and nuts in order, which will save you a lot of time looking for the required parts. 2. The part ID is corresponding to the number labeled on the bag of every part. Some parts may not have label, you can refer to the pictures on the package list.
  • Page 8: Assemble Y Axis

    Shenzhen GETECH CO.,LTD GEEETECH 2 Assemble Y axis 2.1 Assemble the rods of a Y axis Step1. Assemble the 2 threaded rods. Required Required Part ID parts number M10 threaded rod NO.5 Y plate connecting NO.A14 plate M8 spring washer NO.18...
  • Page 9 Shenzhen GETECH CO.,LTD GEEETECH 3) Thread theM10 washer < M8 spring washer < M10 nut < M10 nut< M8 spring washer < M10 washer on the right www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 10 Shenzhen GETECH CO.,LTD GEEETECH Step2. Assemble the 2 smooth rods Required Required number Part ID parts M8 smooth rod NO.3 LM8UU Linear NO.39 bearings Slide 2 bearings on each smooth rod. Before you slide the bearings please make sure they are clean.
  • Page 11 Shenzhen GETECH CO.,LTD GEEETECH Required Required Part ID parts number Acrylic NO. A9, plate( front) A 10 Acrylic NO. A 11, A 12 plate( rear) M10 washer NO.9 M10 nut NO.12 Step1. Slide the rods into the acrylic plate; adjust the length so that the smooth rods fit snugly between the front and rear piece.
  • Page 12: Assemble The Y Idler

    Shenzhen GETECH CO.,LTD GEEETECH * Tips: the Y-axis must be a rectangle, that is the rods on both side should be parallel, so is the front and back plate. Otherwise it will cause obstruction for the belt later. You can use a Digital Caliper to measure.
  • Page 13 Shenzhen GETECH CO.,LTD GEEETECH M3 x 20 NO.27 screw M3 wing NO.15 M4 x25 NO.35 screw M4 lock NO.14 Step1. Thread the M3 x 20 screw through the bearing holder. Step2. Put the M4 x25 screw through the holes with the two 624ZZ bearings in between.
  • Page 14 Shenzhen GETECH CO.,LTD GEEETECH Step3. Mount the assembled bearing holder onto the front support plates. And screw it with a wing nut. *Please leave enough room for the belt between the ball bearing and the screw. www.geeetech.com Tel: +86 755 2658 4110...
  • Page 15: Mount The Y Motor

    Shenzhen GETECH CO.,LTD GEEETECH 2.3 Mount the Y motor www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 16 Shenzhen GETECH CO.,LTD GEEETECH Required parts Required Part ID number Y motor fix plate NO. A13 Stepper motor NO.75 pulley NO.43 M3 x 12 screw NO.25 M3 x 16 screw NO.26 M3 square nut NO.16 Step1. Mount the pulley on the motor shaft, one of the screws should be screwed on the cross section of the shaft.
  • Page 17 Shenzhen GETECH CO.,LTD GEEETECH Step2. Insert the motor block into the slot; you may need to use a little strength to do this. But be careful in case the Acrylic broke down. Then screw the motor on the block plate with 3 M3 x 12 screws and fix the block plate with 2 M3 x 16 screws and M3 square nut.
  • Page 18: Build The Printing Platform

    Shenzhen GETECH CO.,LTD GEEETECH 2.4 Build the printing platform Required parts Required Part ID number Y platform support NO.A15 Y bearing block NO.A16 www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 19 Shenzhen GETECH CO.,LTD GEEETECH Y belt mount NO.67 Zip tie NO.54 M3 x 10 screw NO.24 M3 x 20 screw NO.27 M3 nut NO.11 Step1. Mount the belt mount on the bottom side of the platform with 2 M3 x 10 screws.
  • Page 20 Shenzhen GETECH CO.,LTD GEEETECH Step2. Mount the 4 bearing blocks on the platform with M3 x 20 screws on the same side with the belt-mount. Screw with M3 nuts. Step3. Get the build platform plate zip-tied to the 4 linear bearings of Y- Axis.
  • Page 21 Shenzhen GETECH CO.,LTD GEEETECH *The belt-mount and the fenders are under the platform. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 22: Mount The Y -Axis Belt

    Shenzhen GETECH CO.,LTD GEEETECH 2.5 Mount the Y –axis belt. Required parts Required Part ID number Timing belt NO.41 M3 x 10 screw NO.24 M3 washer NO.7 Step1. Drill a hole on one end of the belt(the hole can be as the diameter of the M3 screw, leave enough margin )...
  • Page 23: Assemble Y - Z Axis

    Shenzhen GETECH CO.,LTD GEEETECH 3 Assemble Y - Z axis Required parts Required Part ID number X-Z frame NO.A1 M3 x 20 screw NO.27 www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 24 Shenzhen GETECH CO.,LTD GEEETECH M3 nut NO.11 Step1. Held upright the main frame is after the acrylic fender washers on the threaded rods. Here you can use the A2 panel as a reference to measure the distance A1 and A12 (the rear plate).
  • Page 25 Shenzhen GETECH CO.,LTD GEEETECH Step3. Screw up the M10 screw on the threaded rod of Y-axis. You can see the finished picture. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 26: Mount The Fan

    Shenzhen GETECH CO.,LTD GEEETECH 4 Mount the fan Required parts Required Part ID number NO.70 M3 x 30 screw NO.28 M3 locknut NO.13 Fix the fan on the right side of the frame with 4 M3 x 30 screw and locknut. Mind the direction of the wires.
  • Page 27: Assemble The Right And Left Side Panel

    Shenzhen GETECH CO.,LTD GEEETECH 5 Assemble the right and left side panel Required parts Required Part ID number Acrylic left frame NO.A2 Acrylic right frame NO.A3 www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 28 Shenzhen GETECH CO.,LTD GEEETECH M3 x 16 screw NO.26 M3 square nut NO.16 Step1. Screw up the X-Z frame and the side panel then connect the rear part of the Y axis and the side panel together. You may need to adjust the distance of the X-Z frame to the rear plate.
  • Page 29: Assemble The Z Axis (The Vertical Axis)

    Shenzhen GETECH CO.,LTD GEEETECH 6 Assemble the Z axis (the vertical axis) 6.1 Assemble the Z-axis bottom mount Required parts Required Part ID number Z Motor fixed plate NO.A4, A5 Z Motor support plate NO.A6, A7 M3 x 16 screw NO.26...
  • Page 30 Shenzhen GETECH CO.,LTD GEEETECH *The right and left bottom mount are different; the left one has a mount for the Z end stop. Please look at the following picture. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 31: Assemble The 2 Z Motors

    Shenzhen GETECH CO.,LTD GEEETECH 6.2 Assemble the 2 Z motors Required parts Required Part ID number Stepper Motor NO.75 M3 x 12screw NO.25 Step1.Thread the wires of the motors through the holes www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 32 Shenzhen GETECH CO.,LTD GEEETECH Step2. Screw up the motors with 4 M3 x 12 screws. Do the same with the other Z motor. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 33: Assemble The X Axis (The Horizontal Axis)

    Shenzhen GETECH CO.,LTD GEEETECH 7 Assemble the X axis (the horizontal axis) 7.1 Assemble the smooth rods. Required parts Required Part ID number 370mm smooth rod NO.2 LM8LUU linear NO.40 bearing Slide the two bearings into the two rods respectively.
  • Page 34 Shenzhen GETECH CO.,LTD GEEETECH Required parts Required Part ID number 624ZZ Ball bearing NO.38 Bearing holder NO. 66 M3 X35 screw NO.29 M4 X25 screw NO.35 M4 locknut NO.14 Step1. Put the screw through the Y bearing holder. www.geeetech.com Tel: +86 755 2658 4110...
  • Page 35 Shenzhen GETECH CO.,LTD GEEETECH Step2. Thread the M4 x 25 screw through the holder with the 624ZZ bearings in between. Lock the other end of a M4 nut. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 36: Assemble The X-Axis End

    Shenzhen GETECH CO.,LTD GEEETECH 7.3 Assemble the X-Axis end Required parts Requir Part ID ed number NO.P1 X-axis left end NO.P2 X-axis right end NO.40 LM8UU linear bearing M3 wing nut NO.15 M3 x 16 screw NO. 26 M3 nut NO.
  • Page 37 Shenzhen GETECH CO.,LTD GEEETECH Step1. Mount the assembled idler into the right X-axis end. Here, you can insert the linear bearing into the end. Step2. Lock it up with a wing nut and insert a linear bearing into the slot.
  • Page 38: Assemble The X-Axis Rods And Both Ends

    Shenzhen GETECH CO.,LTD GEEETECH Step3. Insert another linear bearing into the slot of left end. Then lock the bearing with M3x 16 screw and nut. Do the same to the right end. 7.4 Assemble the X-axis rods and both ends...
  • Page 39 Shenzhen GETECH CO.,LTD GEEETECH M3 x 16 screw NO.26 M3 x50 screw NO.31 M3 nut NO.11 Screw locking ring NO.19 Step1. Thread the screw locking ring to both rods respectively. Screw them up Step2. Thread the two rods into the two X-axis ends.
  • Page 40: Mount The X-Axis Belt Bracket On The Smooth Rods

    Shenzhen GETECH CO.,LTD GEEETECH 7.5 Mount the X-axis belt bracket on the smooth rods. Required parts Required Part ID number print bracket NO.P3 Zip tie NO.54 www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 41 Shenzhen GETECH CO.,LTD GEEETECH NO.40 LM8UU linear bearing Step1. Mount the print bracket on the smooth rods. 1) Insert the linear bearings into the slot of the bracket as you can see from the picture. 2) Thread the zip-tie through the extruder bracket. Tie them up with zip ties.
  • Page 42: Mount The Extruder Holder

    Shenzhen GETECH CO.,LTD GEEETECH 7.6 Mount the extruder holder. Required parts Required Part ID number Extruder bracket NO.P4 M4 x 16screw NO.34 M4 nut NO.11A Step1. Put the 2 M4 nut into the hole, as shown in the picture. www.geeetech.com...
  • Page 43 Shenzhen GETECH CO.,LTD GEEETECH Step2. Screw up the belt bracket and the extruder support with two M4 x 16screws. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 44: Mount The Extruder

    Shenzhen GETECH CO.,LTD GEEETECH 7.7 Mount the extruder Required parts Requir Part ID ed number MK8 extruder NO.79 MK8 assemble board NO.65 M4 x 12 screw NO.33 M4 nut NO.11A www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 45 Shenzhen GETECH CO.,LTD GEEETECH Step1. Mount the assembled extruder on the extruder support. Use 2 M4 x 12 screws and M4 nut to fix. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 46: Mount The X-Axis Motor

    Shenzhen GETECH CO.,LTD GEEETECH 7.7 Mount the X-axis motor. Required parts Required Part ID number Stepper motor NO.75 Pulley NO.43 M3 x 8 screw NO.23 Please pay attention to the mount direction of the pulley, which is opposite to that of the Y-axis.
  • Page 47 Shenzhen GETECH CO.,LTD GEEETECH www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 48 Shenzhen GETECH CO.,LTD GEEETECH 7.8 Amount the X-axis belt. Required parts Required Part ID number Timing Belt NO.42 Zip tie NO.54 Step1. Thread the belt around pulley on the motor end. (*The two linear bearings in the picture should be a longer one, please ignore it) Step2.
  • Page 49 Shenzhen GETECH CO.,LTD GEEETECH Step3. Insert the belt into the slot. You may need to use the grater to file the slot larger. *Pay attention to the tooth mesh of the belt and that on the bracket. Tie up both ends tightly.
  • Page 50: Assemble The X-Z Axis

    Shenzhen GETECH CO.,LTD GEEETECH 8 Assemble the X-Z axis. Required parts Required Part ID number Couplings NO.69 L322 threaded rod NO.4 Step1. Fix the two couplings on both of the threaded rod. And plug it on the motor shaft. *Mind the opening of the couplings, the larger opening should be connected to the threaded rods.
  • Page 51 Shenzhen GETECH CO.,LTD GEEETECH Step2. Thread the threaded rods of Z axis through the brass nuts. It would be easier to do it now. Keep both end of the X axis flush. Step3. Put the assembled X-axis on the Z-axis. Then slide the smooth rod into the linear bearings.
  • Page 52 Shenzhen GETECH CO.,LTD GEEETECH Step4. Assemble the top mount of the Z-axis. Required parts Required Part ID number Z-axis top mount NO.A8 M3 x 16 screw NO.26 M3 square nut NO.16 www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 53: Attach He Heated Bed

    Shenzhen GETECH CO.,LTD GEEETECH 9. Attach he heated bed. Required parts Require Part ID d number MK2A Heat bed NO.71 Borosilicate glass NO.72 www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 54 Shenzhen GETECH CO.,LTD GEEETECH Heating wire NO.51 Thermometry wire NO.50 Wing nut NO.15 Spring NO.37 M3 x35 screw NO.29 clamp NO.53 *All our heated bed is pre-soldered before shipping; you can attach the bed directly here. www.geeetech.com Tel: +86 755 2658 4110...
  • Page 55: Mount The End Stops

    Shenzhen GETECH CO.,LTD GEEETECH Mount the heat bed on the platform with 4 M3 x35 screws and wing nuts with springs in between. Clamp the heat bed and the glass sheet. *the soldered side is better to be attached downwards.
  • Page 56 Shenzhen GETECH CO.,LTD GEEETECH Step2. End stop of Y-axis Required parts Required Part ID number End stop NO.45 M2.5 X 16 screw NO.22 M2.5 Hex nut NO.10 Note: there is no “+” and “-” for endstops, so there is no difference for the wires.
  • Page 57 Shenzhen GETECH CO.,LTD GEEETECH Step3. End stop of Z-axis Required parts Requir Part ID ed number End stop NO.46 M 3 X 16 screw NO.26 M 3 nut NO.11 If you can’t make it with M3 screw you can use the M2.5, as the hole on the end switch/stop is a bit small, you need to use some force.
  • Page 58: Mount The Lcd Panel Frame

    Shenzhen GETECH CO.,LTD GEEETECH 11 Mount the LCD panel frame. Required parts Require Part ID d number LCD 2004 NO.80 LCD frame NO.A21 LCD frame holder NO.A23 www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 59 Shenzhen GETECH CO.,LTD GEEETECH Acrylic washer NO.A20 M3 x 20 screw NO.27 M3 nut NO.11 www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 60: Mount The Psu

    Shenzhen GETECH CO.,LTD GEEETECH If you can not make the LCD frame stand on the A1, you can put another fender (Part No.46) on the third screws. 12 Mount the PSU Required parts Required Part ID number Power supply NO.74 M3 x 10 screw NO.24...
  • Page 61 Shenzhen GETECH CO.,LTD GEEETECH M3 nut NO.11 3D Power cable NO.52 Step1. Mount the PSU (Power supply unit) on the right side panel with 3 M3 x 10 screws. Step2. Mount the AC socket with M3 x 16 screws. First you have to take off one end of the connectors to get both the power button and the power socket into the hole.
  • Page 62 Shenzhen GETECH CO.,LTD GEEETECH *(The connection of wire in this picture is very important; you should pay close www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 63 Shenzhen GETECH CO.,LTD GEEETECH attention in case the PSU suffer a shortcut) Step3. Connect the power cable to PSU. 1) Mind the color of the wires. The wrong connection of the wire will cause serious damage to the PSU and even to the control board of the printer.
  • Page 64 Shenzhen GETECH CO.,LTD GEEETECH See the finished picture here. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 65: Wiring

    Shenzhen GETECH CO.,LTD GEEETECH Close the cover of the connector in case any electric shock. 13 Wiring Example 3: GT2560 Before you start wiring, please take a look at the wiring schematics. You can see original picture here. Step1. The subdivision of stepper motor can be setup by jumper cap, plug all the jumper caps (For A4988) www.geeetech.com...
  • Page 66 Shenzhen GETECH CO.,LTD GEEETECH If you are using DRV8825 instead of A4988, the jumper caps should be changed as follow: Note please, as your printer is single extruder, you will not use the extruder 2. www.geeetech.com Tel: +86 755 2658 4110...
  • Page 67 Shenzhen GETECH CO.,LTD GEEETECH Step2. Plug the 4 A4988 into the stepper motor driver slot. Mind the directions of A4988. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 68 Shenzhen GETECH CO.,LTD GEEETECH If you are using DRV8825 instead of A4988, The correct connections are as follow: www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 69 Shenzhen GETECH CO.,LTD GEEETECH For your convenience, the above two steps is finished by us. you can skip them. Step3. Connect wires for motors. 1) Connect wires for X-axis motor. 2) Connect wires for Y-axis motor. www.geeetech.com Tel: +86 755 2658 4110...
  • Page 70 Shenzhen GETECH CO.,LTD GEEETECH 3) Connect wires for Z-axis motor. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 71 Shenzhen GETECH CO.,LTD GEEETECH 4) Connect Extruder motors www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 72 Shenzhen GETECH CO.,LTD GEEETECH Step4. Connect heating wires. Loosed the screws in the green terminal and put the red wires into the slot and screw it up. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 73 Shenzhen GETECH CO.,LTD GEEETECH www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 74 Shenzhen GETECH CO.,LTD GEEETECH * There is no “+” and “-“for heating wires www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 75 Shenzhen GETECH CO.,LTD GEEETECH 1) Connect heating wires for heatbed. 2) Connect heating wires for extruder . www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 76 Shenzhen GETECH CO.,LTD GEEETECH Step4. Connect wires for thermistor. 1) Connect wires for thermistor of heatbed. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 77 Shenzhen GETECH CO.,LTD GEEETECH 2) Connect wires for thermistor of extruder 0. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 78 Shenzhen GETECH CO.,LTD GEEETECH Step5. Connect wires for endstop. * There is no “+” and “-“for endstop 1) Connect wires for endstop of X-axis at X-Min. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 79 Shenzhen GETECH CO.,LTD GEEETECH 2) Connect wires for endstop of Y-axis at Y-Min. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 80 Shenzhen GETECH CO.,LTD GEEETECH 3) Connect wires for endstop of Z-axis at Z-Min. Step6. Connect wires for Fan. 1) Connect fan for control board at FAN3. Note the “+” and “-“for fan Red: + Black: - www.geeetech.com Tel: +86 755 2658 4110...
  • Page 81 Shenzhen GETECH CO.,LTD GEEETECH If you use the 2-pin extension wire for the fan, just plug them on the + and - of the sl www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 82 Shenzhen GETECH CO.,LTD GEEETECH 2) Connect fan for extruder at FAN1. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 83 Shenzhen GETECH CO.,LTD GEEETECH Step7. Connect wires for LCD panel. There are two cables, one is for LCD encoder, the other is for SD card, do not connect them reversed. EXP1 to LCD EXP2 to SD card BTW, do you see the small screw above the SD card reader, if the text in of the LCD phases in an out or there is only blocks on the screen, you can adjust this screw to recovery it.
  • Page 84 Shenzhen GETECH CO.,LTD GEEETECH Step8. Connect wires for power input. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 85 Shenzhen GETECH CO.,LTD GEEETECH www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 86: Mount The Board

    Shenzhen GETECH CO.,LTD GEEETECH Note the correspondence between the color of wires and the connector. Brown------L Blue ------N Yellow ------GND ------ --+ V Black------COM That is all for the wiring of GT2560. 14 Mount the board Part Required Required parts number NO.77...
  • Page 87 Shenzhen GETECH CO.,LTD GEEETECH www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 - 858...
  • Page 88: Tidy Out The Wires

    Shenzhen GETECH CO.,LTD GEEETECH 15. Tidy out the wires. Use the wire coil to tie put those wires together. There are holes on the acrylic plates for the wires, you can arrange them as you like. 16 Mount the filament spool.
  • Page 89 Shenzhen GETECH CO.,LTD GEEETECH M3 x 16 screw NO.26 M3 square nut NO.16 PVC tube NO.60,61 The whole printer assembly work is already done. Before even attempting the first print it is vital that the printer is correctly calibrated. Skipping or rushing this step will result in frustration and failed prints later, so it is important to take the time to make sure the machine is correctly set up.
  • Page 90 Shenzhen GETECH CO.,LTD GEEETECH addressed.  Frame is stable and correctly aligned.  Belts are taut.  Bed is level in relation to the path of the extruder.  Filament rolls freely from the spool, without causing too much tension on the extruder.

This manual is also suitable for:

Acrylic prusa i3 pro b

Table of Contents