Enclosure; Steps For Different Installation Scenarios - IBM Storwize V5000 Quick Installation Manual

Hide thumbs Also See for Storwize V5000:
Table of Contents

Advertisement

2
Storwize V5000: Quick Installation Guide
Table 5. Steps for different installation scenarios
New system (control
enclosure and one or
New system (control
more expansion
enclosure only)
enclosures)
"Reviewing your
"Reviewing your
packing slip" on
packing slip" on
page 5
page 5
"Identify the
"Identify the
hardware
hardware
components" on page
components" on page
6
6
"Verify
"Verify
environmental
environmental
requirements" on
requirements" on
page 11
page 11
"Review enclosure
"Review enclosure
location guidelines"
location guidelines"
on page 11
on page 11
"Installing the
"Installing the
support rails" on
support rails" on
page 13
page 13
"Installing the
"Installing the
enclosures" on page
enclosures" on page
17
17
"Connecting Ethernet
"Connecting SAS
cables to node
cables to expansion
canisters" on page 22
enclosures" on page
18
"Connecting Ethernet
"Connecting Fibre
cables to node
Channel cables to
canisters" on page 22
a Fibre Channel
host interface
adapter" on page
24
"Powering on the
"Connecting Ethernet
system" on page 27
cables to node
canisters" on page 22
Chapter 3,
"Powering on the
"Configuring the
system" on page 27
system," on page 29
Chapter 3,
"Configuring the
system," on page 29
1
Complete these steps for each expansion enclosure that you add.
2
Complete these steps for each control enclosure and expansion enclosure that you add.
Adding control
Adding expansion
enclosures and
enclosures to an
expansion enclosures
existing system
to an existing system
"Reviewing your
"Reviewing your
packing slip" on
packing slip" on
page 5
page 5
"Identify the
"Identify the
hardware
hardware
components" on page
components" on page
6
6
"Verify
"Verify
environmental
environmental
requirements" on
requirements" on
page 11
page 11
"Review enclosure
"Review enclosure
location guidelines"
location guidelines"
on page 11
on page 11
"Installing the
"Installing the
support rails" on
support rails" on
1
page 13
page 13
"Installing the
"Installing the
enclosures" on page
enclosures" on page
1
2
17
17
"Connecting SAS
"Connecting SAS
cables to expansion
cables to expansion
enclosures" on page
enclosures" on page
1
1
18
18
"Powering on the
"Connecting Ethernet
1
system" on page 27
cables to node
canisters" on page
2
22
"Adding an
Optional:
expansion enclosure
"Connecting Fibre
to an existing
Channel cables to a
system" on page 38
Fibre Channel host
interface adapter" on
page 24
"Powering on the
system" on page 27
"Adding a control
enclosure to an
existing system" on
page 38
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents