Tilslutning Af Tænd/Sluk-Ur (Ekstraudstyr); Indstilling Af Kedelværdier; Connecting The Time Switch (Accessory); Setting The Boiler Values - Baxi NUVOLA PREMIX 23 Installers And Users Instructions

Wall-mounted, condensing gas boilers with built-in hot-water cylinder
Table of Contents

Advertisement

Tilslutning af tænd/sluk-ur
(ekstraudstyr)
• Fjern de 2 skruer som kedelstyringens instrumentpanel er fastgjort til
kedlen med, og drej instrumentpanelet nedad;
• fjern 5 skruer fra instrumentpanelets låg og drej dette opad;
• tilslut kontakturets motor til klemme 3 og 4 (på hovedprintpladen i
øverste højre hjørne (blank spadestik));
• kontakturet tilsluttes til klemme 25 og 26 på klemrække M8 i stedet
for den gule lus.
For den korrekte tilslutning af kontakturet, se også eldiagram på side 34.
Bliver kontakturet forsynet med strøm over batterier i stedet for over
strømnettet, foretages der ingen forbindelse til klemme 3 og 4.
Kontakturet kan også styre det varme vand. I så fald skal kontakturet
tilsluttes klemme 23 og 24 på klemrække M8 i stedet for den gule lus.
Indstilling af kedelværdierne
Kedlens indstillingsværdier kontrolleres og / eller indstilles på følgende
måde:
1. Sluk for kedlen på omskifteren SOMMER / VINTER (knap 11-side 5)
2. Fjern de 2 skruer, som kedelstyringens instrumentpanel er fastgjort til
kedlen med, og drej instrumentpanelet nedad. (se side 24)
3. Hold "trykknappen for programmering" (på instrumentpanelets
bagside) nede samtidig med, at kedlen igen tændes ved drejning på
SOMMER / VINTER –omskifteren (knap 11)
4. Vent til signalet (PL) lyser op i displayet
5. Slip "Trykknap for programmering" – kedlen er nu i programmerings-
status.
6. Luk instrumentpanelet og skru det fast på kedlen igen
Programmeringsprincip.
Herefter kan trykknapperne på instrumentpanelet (fig 8) anvendes til
programmering efter flg. Princip:
Valg af parameter nr. (se oversigt 1)
Holde knap 8 trykket ind og samtidig trykke på knap 7 for valg af højere
parameter-Nr.
eller knap 2 for lavere parameter-Nr.
.
Fig. 8
Connecting the time switch
(accessory)
• Remove the 2 screws which secure the instrument panel of the boiler
controls to the boiler, and pivot the instrument panel downwards.
• Remove 5 screws from the cover of the instrument panel and pivot this
upwards.
• Connect the motor of the time switch to terminal 3 and 4 (on the main
printed circuit board in the top right-hand corner (shiny spade)).
• The time switch is connected to terminals 25 and 26 on the M8 terminal
block instead of the yellow jumper.
See also the wiring diagram on page 34 for the correct connection of the
time switch.
If the time switch is supplied with power via batteries instead of via the
mains supply, do not connect it to terminals 3 and 4.
The time switch can also control the hot water. In this case, the time
switch must be connected to terminals 23 and 24 on the M8 terminal block
instead of the yellow jumper.

Setting the boiler values

Check and/or adjust the set values of the boiler in the following way:
1.
Turn off the boiler by means of the SUMMER / WINTER selector
switch (button 11 – page 5).
2.
Remove the two screws which secure the instrument panel of the
boiler controls to the boiler, and pivot the instrument panel
downwards. (See page 24)
3.
Hold down the "programming push button" (on the back of the
instrument panel) at the same time as relighting the boiler by turning
the SUMMER / WINTER selector switch (button 11).
4.
Wait for the signal (PL) to light up on the display.
5.
Release the "programming push button" – the boiler is now in
programming mode.
6.
Close the instrument panel and screw it securely to the boiler again.
Programming method
Now the push buttons on the instrument panel (fig. 8) can be used for
programming according to the following method:
Selection of parameter no. (see table 1)
Hold down button 8 and at the same time press button 7 to select a higher
parameter number, or button 2 for a lower parameter number.
9806290300
25

Advertisement

Table of Contents
loading

Table of Contents