Safety Guidelines
Electrical Equipment Guidelines
Follow these basic guidelines when working with any electrical equipment:
•
•
•
•
•
PA-POS-2OC3 Two-Port Packet-over-SONET Port Adapter Installation and Configuration
2-10
Before beginning any procedures requiring access to the chassis interior, locate the emergency
power-off switch for the room in which you are working.
Disconnect all power and external cables before moving a chassis.
Do not work alone if potentially hazardous conditions exist.
Never assume that power has been disconnected from a circuit; always check.
Do not perform any action that creates a potential hazard to people or makes the equipment unsafe.
Carefully examine your work area for possible hazards such as moist floors, ungrounded power
extension cables, and missing safety grounds.
Chapter 2
Preparing for Installation
OL-3028-06