Leb Electronics STONE 230 Instructions And Warnings For Installation, Use And Maintenance page 16

Underground gear motor for wings gates
Hide thumbs Also See for STONE 230:
Table of Contents

Advertisement

Available languages

Available languages

ENGLISH
- In line with the type of selected installation, place the foundation
box, following the indications shown in the figures 4a, 4b and 4c.
- Dig a hole as per the measurements shown in fig.2. Foresee an
additional space for the pipes of water drainage and electric cables.
- Place the foundation box inside the hole so that the pin welded to
the box is aligned with the upper hinge of the gate (fig.3 and fig.4).
- Insert the two pipes
on the box. Connect the pipes to a good canal of the rain
dispersion.
- Connect the tube of the electric cables into the special hole fitted on
the box, on the side of the wing opening.
- Cast the concrete inside the hole, making sure the box is level. It
must be 5 mm higher than the finished floor (cover thickness).
- Wait for the concrete has solidified.
Shutter
Pillar
Foundation box - Installation
of water drainage
Fig.3
Fig.4a
90°/100°
into the special holes fitted
Fig.4b
Shutter
Pillar
Fig.4c
Shutter
Pillar
- 15 -
180°
110°

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Leb Electronics STONE 230

This manual is also suitable for:

Stone 24

Table of Contents