Installation; Preliminary Checks - Leb Electronics STONE 230 Instructions And Warnings For Installation, Use And Maintenance

Underground gear motor for wings gates
Hide thumbs Also See for STONE 230:
Table of Contents

Advertisement

Available languages

Available languages

Preliminary checks

Before installing STONE check the following points:
- Make sure that the device operates within its limits of employment
described in the technical characteristics table.
- Make sure that the gate structure is sturdy and that the wing moves
without frictions or other impediments.
- Make sure that the device is undamaged.
- Don't install the product in explosive environments.
- Perform all the structural changes in order to ensure safety
distances and protect and segregate areas in which people may be
exposed to the risk of crushing, shearing, dragging or similar
dangers.
- Foresee a free area destined to the operations of maintenance and
unblocking.
- For anything not expressly specified in this handbook, follow the
norms in force.
- Each wing must have just one hinge, remove any extra ones.
- Don't install the device on blank wing gates, functioning cannot be
guaranteed in the presence of strong wind.
- For complete safety, the mechanical stops with rubber cap (floor
stops) must be fitted in opening and closing of the wing. They
delimit the extreme points of opening and closing of the wing.
Foundation box dimensions (mm)
240

INSTALLATION

Fig.2
220
62
105
7
320
- 14 -
187
159
ENGLISH
187
A
A
374

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stone 24

Table of Contents