Hach POLYMETRON 8810 ORP Basic User Manual page 9

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Cable preparation
To conform with security standards and to respect the EMC compliancy of the analyzer, this procedure must be
followed for all user supplied cables before connecting them to the electronic unit of the analyzer.
Materials required:
• Shielded cable (diameter minimum 4.5 mm - maximum 6 mm) with 2 or 3 wires depending on
function (RS232 = 3 wires, Alarm = 2 wires, etc.)
• Metal cable gland
• Grounding ferrule
• 2 or 3 protective plugs for the exposed wires
• Clamp for the grounding ferrule
• Crimping pliers for the protective plugs
W A R N I N G
English 9

Advertisement

Table of Contents
loading

Table of Contents