Remote Signal Duration; Day Of The Week - Pentair FLECK 2910 NXT Installer Manual

Hide thumbs Also See for FLECK 2910 NXT:
Table of Contents

Advertisement

Info
This mode can be combined with the other methods of regeneration
The remotely started regenerations overrule the other regeneration type once the signal
is acquired.
Options:
• off;
• immediate;
• delayed.
1. Set the remote regeneration mode with
ð Default setting: off;
2. Press
to validate the selection and advance to the next
parameter.

6.2.5.20 Remote signal duration

Set remote signal duration.
Info
The availability depends on remote regeneration option programmed in the previous
step.
The contact will close after a preset signal duration. When the contact closes, remote
regeneration signal is acquired and a regeneration will start (immediate or delayed) as
programmed in Remote regeneration [}Page 104] .
1. Set the signal duration with
ð Can be adjusted from 1 to 5940 seconds;
2. Press
to validate the selection and advance to the next
parameter.

6.2.5.21 Day of the week

Select the day of the week of regeneration.
Info
Available only for day of the week regeneration type.
Options:
• Sunday;
• Monday;
• Tuesday;
• Wednesday;
• Thursday;
Ref. MKT-IM-002 / E - 12.11.2019
Installer manual Fleck 2910 NXT/NXT2 - Programming
and
;
and
;
Remote regeneration
deactivated.
105 / 172

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fleck 2910 nxt2

Table of Contents