Install copper bars between the battery modules, and then install cables between the
battery modules and the battery management module.
Connect the round hole of the copper bar to the upper battery module, and then connect
the waist hole of the copper bar to the lower battery module.
After the copper bar on each terminal is secured, reinstall the protective cover on the
terminal.
Battery cables are preinstalled inside the cabinet.
Excessive bolts will be used as spare parts.
Figure 3-22 Installing copper bars and cables
Step 6 Reinstall the battery management module.