Electrical Supply Lines - Siemens Cerberus PACE Mounting & Installation

System
Hide thumbs Also See for Cerberus PACE:
Table of Contents

Advertisement

Preparatory work
3

Electrical supply lines

3.3 Electrical supply lines
16 | 24
Siemens Schweiz AG
Fire Safety
General guidelines
1. Read the safety instructions for electrical installations in Safety regulations for
the method of operation [➙ 10].
2. Batteries must only be inserted and connected in the housing by authorized
specialist personnel.
The connections for the transmission paths and fuses must be clearly marked.
The mains supply line must be designed with at least 1.5 mm
The fuse for each outer conductor must be above the rated current indicated on
the type plate.
In order to avoid an unintentional shutdown, the mains supply line must not be
routed via a switch.
See also
1 Safety regulations for the method of operation [➙ 10]
per conductor.
2
A6V10430579_en--_a
2018-06-08

Advertisement

Table of Contents
loading

Table of Contents