Installation And Commissioning Checklist - CanadianSolar CSI Series Installation And Operation Manual

Grid-tied pv inverter
Table of Contents

Advertisement

PROJECT NAME
LOCATION
INSTALLATION AND
COMMISSIONING CHECKLIST
Step
No.
Content
Communication
1
cable (if function
is used)
Supply DC /
2
AC power
www.canadiansolar.com
.46.
NUMBER
Details
Connect the RS485 cable to the communication port.
CSI-xx-KTL-GI:
1. Switch the grid supply main Switch (AC) ON first.
2. Switch the DC switch ON. If the voltages of PV arrays
are higher than start up voltage, the inverter will turn
on. The red LED power will be continuously lit.
3. When both the DC and the AC sides supply to the
inverter, it will be ready to generate power. Initially,
the inverter will check both its internal parameters and
the parameters of the AC grid, to ensure that they are
within the acceptable limits. At the same time, the green
LED will lash and the LCD displays the information
of INITIALIZING.
3 PHASE STRING INVERTERS
(KTL SERIES)
Warning: This checklist is not a replacement for the user manual.
Please read the user manual prior to inverter site selection and installation.
Values / Notes
Please return completed form to inverter.register@canadiansolar.com
Conclusion
[ ] Completed
[ ] Completed
Record LEDs status in Notes
.47.