OPERATING PROCEDURES
4. Place the sampling valve in the OFF (center)
position.
6
5. Press the PRIME (+ + +) key.
6. Slowly move the syrup sampling valve to the fully
open position by turning the handle "down" toward
the sampling line. Allow the liquid to run into a pail
until all the sanitizer is removed and full-strength
product is flowing.
6-8
Figure 6-28
Figure 6-29
Figure 6-30
11229
Note: Brix is the ratio of syrup to water which will
18092
directly affect the quality and taste of the product.
Brixing should be done before priming the freezer
and when a change in syrup flavor has been made.
7. Drain the product from the syrup sampling valve into
a cup. Close the syrup sampling valve by turning the
handle to the center position.
13039p
8. Stir the finished product. Pour a small amount of
product over the refractometer. The brix reading
should register 13 to 14. A reading higher than this
would cause a darker, richer product. The
refrigeration system would have to run longer to
freeze this excess syrup. A reading lower than this
could cause a freeze-up in the freezing cylinder
because of the excess water.
Model C300
Figure 6-31
Figure 6-32
Operating Procedures
18032
18092