Installing The Rails In An Ibm 19-Inch Rack - IBM N3400 Installation And Setup Instructions

Table of Contents

Advertisement

2. Verify that the shipping packages include the following items:
N3400 (2859-A11)
1 single-controller N3400
1 system bezel
1 console adapter, RJ-45 to DB-9
1 serial null modem cable
1 electrostatic discharge (ESD) wrist strap
2 power cords
1 publications CD
1 or more envelopes with the software End User License Agreement (EULA) and license keys
1 rack mount kit (optional)
N3400 (2859-A21)
1 dual-controller N3400
1 system bezel
2 console adapters, RJ-45 to DB-9
2 serial null modem cables
1 ESD wrist strap
2 power cords
1 publications CD
1 or more envelopes with the software EULA and license keys
1 rack mount kit (optional)
3. Remove the foam hardware protectors and the plastic surrounding the system.

Installing the rails in an IBM 19-inch rack

Use these instructions to install the rails on which you will mount the N3400.
Attention: Read these instructions in their entirety before proceeding.
Model A11
Expansion Unit 2
Expansion Unit 1
N3400
(A11)
Observe the following rules and restrictions when installing an N series system in a standard IBM 19-inch
(48.26 cm) equipment rack with mounting rails:
2
Model A21
.
.
.
Expansion Unit 2
Expansion Unit 1
.
.
.
Expansion Unit 2
Expansion Unit 1
N3400
(A21)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents